[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891964":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},891964,577,2,"多选题","风管安装连接后，在刷油、绝热前应按规范进行（ ）检测。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","漏风量",true,{"key":16,"text":17,"correct":18},"B","强度",false,{"key":20,"text":21,"correct":18},"C","压力",{"key":23,"text":24,"correct":14},"D","严密性","AD","风管安装连接后，在刷油、绝热前应按规范进行严密性、漏风量检测。",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]