[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891871":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},891871,577,2,"多选题","工程造价对比分析主要考核（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","实物工程量",true,{"key":16,"text":17,"correct":14},"B","材料消耗量",{"key":19,"text":20,"correct":14},"C","建设单位管理费",{"key":22,"text":23,"correct":24},"D","施工单位企业管理费",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]