[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891856":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},891856,577,2,"多选题","费用定额的组成包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","预算费用定额",false,{"key":16,"text":17,"correct":18},"B","措施费费用定额",true,{"key":20,"text":21,"correct":14},"C","消耗量费用定额",{"key":23,"text":24,"correct":18},"D","企业管理费费用定额",{"key":26,"text":27,"correct":18},"E","规费费用定额","BDE","费用定额是规定各有关工程费用的取费标准，包括取费的基础和取费的费率，主要包括：①措施费费用定额。措施费费用定额主要是指通过取费来计取的措施项目的取费标准如夜间施工费、二次搬运费、冬雨期施工增加费、已完工程及设备保护费等费率；②企业管理费费用定额。企业管理费是指建筑安装企业组织施工生产和经营管理所需费用。企业管理费费用定额由施丁企业根据自己的经营管理水平和市场竞争情况等因素综合确定；③规费费用定额。规费是政府和有关权力部门规定必须缴纳的费用，包括社会保障费、住房公积金、工伤保险、工程排污费等。规费费用定额由国家或地区相关政府主管部门测定和发布。",{"id":6,"name":31,"category":32,"favorite":33},"[安装工程]建设工程计量与计价实务","建筑工程",0]