[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891818":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},891818,577,2,"多选题","属于专业措施项目的有（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","行车梁加固",true,{"key":16,"text":17,"correct":18},"B","电缆试验",false,{"key":20,"text":21,"correct":14},"C","地震防护",{"key":23,"text":24,"correct":14},"D","顶升装置拆除安装","ACD","",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]