[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891817":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},891817,577,2,"多选题","依据《通用安装工程工程量计算规范》（GB 50856-2013），其他项目清单中的暂列金额包括（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程合同签订时尚未确定或者不可预见的所需材料、工程设备、服务的采购等费用",true,{"key":16,"text":17,"correct":18},"B","施工过程中出现质量问题或事故的处理费用",false,{"key":20,"text":21,"correct":14},"C","施工中可能发生工程变更所需费用",{"key":23,"text":24,"correct":14},"D","合同约定调整因素出现时的合同价款调整及发生的索赔、现场签证确认等的费用","ACD","",{"id":6,"name":28,"category":29,"favorite":30},"[安装工程]建设工程计量与计价实务","建筑工程",0]