[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891710":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},891710,577,2,"多选题","关于施工方案交底说法正确的是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","“四新”项目交底",true,{"key":16,"text":17,"correct":18},"B","指导工程施工管理的综合性文件",false,{"key":20,"text":21,"correct":14},"C","特殊环境、特种作业交底",{"key":23,"text":24,"correct":18},"D","总包的编制人员应向施工作业人员",{"key":26,"text":27,"correct":14},"E","交底内容应包括质量控制、安全措施","ACE","施工组织总设计指导整个工程全过程施工的技术经济纲要，故B错误。工程施工前，施工方案的编制人员应向施工作业人员作施工方案的技术交底。故D错误。",{"id":6,"name":31,"category":32,"favorite":33},"[安装工程]建设工程计量与计价实务","建筑工程",0]