[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891548":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},891548,577,1,"单选题","根据建筑电气项目计量规则，避雷针按名称、规格、材质、安装形式和高度以（ ）计算；半导体少长针消雷装置按设计图示数量以（ ）计算。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","套，套",false,{"key":16,"text":17,"correct":14},"B","套，根",{"key":19,"text":20,"correct":21},"C","根，套",true,{"key":23,"text":24,"correct":14},"D","根，根","知识点:建筑电气项目计量规则。避雷针按名称、规格、材质、安装形式和高度以“根”计算；半导体少长针消雷装置按设计图示数量以“套”计算。参见教材P245。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]