[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891476":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},891476,577,1,"单选题","根据管道工程系统安装的通用工艺流程，首先要进行的工作是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预制加工",false,{"key":16,"text":17,"correct":18},"B","安装准备",true,{"key":20,"text":21,"correct":14},"C","定位放线",{"key":23,"text":24,"correct":14},"D","干管安装","知识点:给排水、采暖、燃气工程施工技术。根据管道工程系统安装的通用工艺流程，首先要进行的工作是安装准备。参见教材P65。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]