[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891469":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},891469,577,1,"单选题","依据《通用安装工程工程量计算规范》（GB 50856—2013）的规定，高压管道检验编码应列项在（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工业管道工程项目",false,{"key":16,"text":17,"correct":18},"B","措施项目",true,{"key":20,"text":21,"correct":14},"C","给排水工程项目",{"key":23,"text":24,"correct":14},"D","采暖工程项目","组装平台搭拆、管道防冻和焊接保护、特殊管道充气保护、高压管道检验、地下管道穿越建筑物保护等措施项目，应按《通用安装工程工程量计算规范》GB50864-2013措施项目相关项目编码列项。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]