[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891460":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},891460,577,1,"单选题","下列关于投标人其他项目清单与计价表的编制说法错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","暂列金额应按照招标人提供的其他项目清单中列出的金额填写，不得变动",false,{"key":16,"text":17,"correct":14},"B","暂估价不得变动和更改",{"key":19,"text":20,"correct":14},"C","计日工自主确定各项综合单价并结合自身的用工价格水平计算费用",{"key":22,"text":23,"correct":24},"D","总承包服务费需要招标人确定",true,"知识点:安装工程工程量清单计价。综合单价包括完成一个规定清单项目所需的人工费、材料（设备）费、施工机具使用费、企业管理费和利润，并考虑风险费用的分摊及价格竞争因素。参见教材P56。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]