[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891453":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},891453,577,1,"单选题","汇总工程量时，以立方米为单位的，应保留小数点后（ ）位小数。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一",false,{"key":16,"text":17,"correct":18},"B","二",true,{"key":20,"text":21,"correct":14},"C","三",{"key":23,"text":24,"correct":14},"D","四","知识点:安装工程分部分项工程工程量清单。以立方米为单位的，应保留小数点后两位小数。参见教材P39。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]