[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891450":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},891450,577,1,"单选题","在《2012安装工程预算定额》中“电缆敷设”项目的工程量以（ ）计算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","米",true,{"key":16,"text":17,"correct":18},"B","千米",false,{"key":20,"text":21,"correct":18},"C","公尺",{"key":23,"text":24,"correct":18},"D","英尺","知识点:安装工程预算定额。在《2012安装工程预算定额》中“电缆敷设”项目的工程量计算规则为“按设计图示长度（含预留）尺寸，另加弯曲和张弛度，以米计算”。参见教材P46。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]