[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891294":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},891294,577,1,"单选题","因国家法律、法规、规章和政策发生变化影响合同价款的风险，发、承包双方应在合同中约定承担人为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","发包人",true,{"key":16,"text":17,"correct":18},"B","承包人",false,{"key":20,"text":21,"correct":18},"C","发、承包双方均摊",{"key":23,"text":24,"correct":18},"D","发、承包双方约定分摊","本题考查的是安装工程工程量清单计价。因国家法律、法规、规章和政策发生变化影响合同价款的风险，发、承包双方应在合同中约定由发包人承担。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]