[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891258":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},891258,577,1,"单选题","下列各项不属于总成包服务费内容的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","配合分包单位施工的医务人员工资",false,{"key":16,"text":17,"correct":14},"B","现场生产.生活用水电设施.管线敷设摊销费",{"key":19,"text":20,"correct":21},"C","为分包单位单独搭设的脚手架搭拆.摊销费",true,{"key":23,"text":24,"correct":14},"D","共用垂直运输设备的使用.折旧.维修费","本题考查的是《安装工程预算定额》。总承包服务费的内容包括共用脚手架搭设、摊销费（不包括为分包单位单独搭设的脚手架）。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]