[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891134":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},891134,577,1,"单选题","根据2017电气设备安装工程预算定额，关于防雷及接地装置，错误的说法是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","本章定额已包括高空作业工时，不得另行计算",false,{"key":16,"text":17,"correct":14},"B","接地母线.引下线.避雷网的搭接长度，分别综合在有关定额子目中，不得另行计算",{"key":19,"text":20,"correct":21},"C","均压环敷设长度按设计需要作为均压接地梁的面积计算",true,{"key":23,"text":24,"correct":14},"D","避雷网.接地母线敷设按照设计图示敷设数量以“m”为计量单位","本题考查的是建筑电气工程定额应用。均压环敷设长度按设计需要作为均压接地梁的中心线长度以“m”为计量单位。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]