[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891112":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},891112,577,1,"单选题","根据建筑电气项目计量规则，低压封闭式插接母线槽按名称、型号、规格、容量（A )、线制、安装部位，按设计图示尺寸以（ ）计算。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","中心线长度“km”",false,{"key":16,"text":17,"correct":14},"B","单相长度“km”",{"key":19,"text":20,"correct":21},"C","中心线长度“m”",true,{"key":23,"text":24,"correct":14},"D","单相长度“m”","本题考查的是建筑电气项目计量规则。低压封闭式插接母线槽按名称、型号、规格、容量（A )、线制、安装部位，按设计图示尺寸以中心线长度“m”计算。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]