[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891092":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},891092,577,1,"单选题","措施项目费中的（ ）应当按照国家或本市建设主管部门相关规定标准计价，该部分不得作为竞争性费用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","夜间施工费",false,{"key":16,"text":17,"correct":18},"B","安全文明施工费",true,{"key":20,"text":21,"correct":14},"C","二次搬运费",{"key":23,"text":24,"correct":14},"D","高层施工增加费","措施项目费中的安全文明施工费应当按照国家或本市建设主管部门相关规定标准计价，该部分不得作为竞争性费用。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]