[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891090":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},891090,577,1,"单选题","确定( )是分部分项工程和单价措施项目清单与计价表编制过程中最主要的内容。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","人工费",false,{"key":16,"text":17,"correct":14},"B","材料费",{"key":19,"text":20,"correct":14},"C","机械费",{"key":22,"text":23,"correct":24},"D","综合单价",true,"工程量清单由招标人提供，分部分项工程和单价措施项目清单与计价表的费用组成为工程量乘以综合单价，所以确定综合单价是分部分项工程和单价措施项目清单与计价表编制过程中最主要的内容。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]