[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891079":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},891079,577,1,"单选题","当《安装工程计算规范》附录中所列的工程量清单没有宝涵所有项目时，编制人需要补充清单项目，然后报（ ）备案。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","国务院有关部门",false,{"key":16,"text":17,"correct":18},"B","省级或行业工程造价管理机构",true,{"key":20,"text":21,"correct":14},"C","县级及以上行政主管部门",{"key":23,"text":24,"correct":14},"D","国务院附属机构","工程量清单的补充 （1）工程量的计算依据工程量计算规则来计算，所有清单项目的工程量应以实体工程量为准，并以完成后的净值计算。 （2）编制补充项目由专业工程代码03 与B 和三位阿拉伯数字组成。不得重码，同时在工程量清单中应附补充项目的项目名称、项目特征、计量单位、工程量计算规则和工作内容。报省级或行业工程造价管理机构备案。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]