[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-891062":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},891062,577,1,"单选题","关于安全防范系统工程执行中应注意的问题，说法错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","微机矩阵切换设备按视频输入通道数进行计算，输出通道数不另行计取",false,{"key":16,"text":17,"correct":14},"B","视频信号用接头制作执行第二章接头制作相应子目",{"key":19,"text":20,"correct":21},"C","成品跳线不仅计取安装费用，还要计取制作费用",true,{"key":23,"text":24,"correct":14},"D","微机矩阵切换设备定额子目按一个机箱的容量设置的，增加机箱按照实际增加通道数执行相应的子目","本题考查的是建筑智能化工程计量及应用案例。成品跳线只计取安装费用，不能计取制作费用。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]