[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890815":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},890815,577,1,"单选题","依据《通用安装工程工程量计算规范》（GB50856-2013）,静置设备安装工程量计量时，根据项目特征以“座”为计量单位的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","金属油罐中拱顶罐制作安装",false,{"key":16,"text":17,"correct":14},"B","球形罐组对安装",{"key":19,"text":20,"correct":14},"C","热交换器设备安装",{"key":22,"text":23,"correct":24},"D","火炬及排气筒制作安装",true,"火炬及排气筒制作安装应根据项目特征（名称，构造形式，材质，质量，简体直径，高度，灌浆配合比），以“座”为计量单位，按设计图示数量计算。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]