[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890800":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},890800,577,1,"单选题","发包人在（ ）天内未提交合同价款调减报告的，应视为发包人对该事项不存在调整价款请求。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","14",true,{"key":16,"text":17,"correct":18},"B","15",false,{"key":20,"text":21,"correct":18},"C","30",{"key":23,"text":24,"correct":18},"D","10","出现合同价款调减事项（不含工程量偏差、索赔）后的14天内，发包人应向承包人提交合同价款调减报告并附相关资料；发包人在14天内未提交合同价款调减报告的，应视为发包人对该事项不存在调整价款请求。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]