[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890758":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},890758,577,1,"单选题","（ ）是分部分项工程项目、措施项目、其他项目的名称、单位和相应数量以及规费、税金项目等内容等的明细详单。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计价规范",false,{"key":16,"text":17,"correct":18},"B","工程量清单",true,{"key":20,"text":21,"correct":14},"C","计算规则",{"key":23,"text":24,"correct":14},"D","分部分项工程量清单","安装工程造价采用清单计价的，其工程量的计算应依照现行的《通用安装工程工程量计算规范》（GB 50856—2013）附录中安装工程工程量清单项目及计算规则进行工程计量，以工程量清单的形式表现。工程量清单是载明建设工程分部分项工程项目、措施项目、其他项目的名称、单位和相应数量以及规费、税金项目等内容的明细清单。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]