[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890727":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},890727,577,1,"单选题","电气工程预埋件的埋设方法取决于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预埋件类型",false,{"key":16,"text":17,"correct":18},"B","土建结构类型",true,{"key":20,"text":21,"correct":14},"C","电气装置类型",{"key":23,"text":24,"correct":14},"D","预埋件位置","电气配线分为明配和暗配两种，预埋件的埋设方法取决于土建结构类型。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]