[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890553":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},890553,577,1,"单选题","下列选项中，不属于施工方案的交底内容的是（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工程序和顺序",false,{"key":16,"text":17,"correct":14},"B","施工工艺",{"key":19,"text":20,"correct":14},"C","质量控制",{"key":22,"text":23,"correct":24},"D","施工总平面布置图",true,"",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]