[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890530":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},890530,577,1,"单选题","某台起重机吊装一设备，已知吊装重物的量为Q(包括索、吊具的重量)、吊装计算载荷应为（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","Q",false,{"key":16,"text":17,"correct":18},"B","1.1Q",true,{"key":20,"text":21,"correct":14},"C","1.2Q",{"key":23,"text":24,"correct":14},"D","1.1×1.2Q","本题考查吊装计算荷载。吊装载荷Qj=K1?K2?Q 式中： Qj—计算载荷； 动载系数K1为1.1； 不均衡荷系数K2为1.1～1.2； Q—设备及索吊具重量。 单台起重机吊装仅需在设备及索吊具重量的基础上考虑动载系数K1，多台（包括两台）起重机吊装既需要考虑动载系数K1，又需要考虑不均衡荷系数K2。本题单台起重机械计算载荷=1.1×吊装载荷。故B选项正确。",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]