[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890420":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},890420,577,1,"单选题","安装工程的主体是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","管道敷设",false,{"key":16,"text":17,"correct":18},"B","设备安装",true,{"key":20,"text":21,"correct":14},"C","线路敷设",{"key":23,"text":24,"correct":14},"D","设备基础","",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]