[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890275":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},890275,577,1,"单选题","利用水箱减压，适用于允许分区设置水箱，电力供应充足，电价较低的各类高层建筑，水泵数目少，维护管理方便，分区水箱容积小，少占建筑面积，下区供水受上区限制，屋顶箱容积大，这种供水方式为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分区并联给水",false,{"key":16,"text":17,"correct":14},"B","分区串联给水",{"key":19,"text":20,"correct":21},"C","分区水箱减压给水",true,{"key":23,"text":24,"correct":14},"D","分区减压阀减压给水","",{"id":6,"name":27,"category":28,"favorite":29},"[安装工程]建设工程计量与计价实务","建筑工程",0]