[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-574-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},574,"环境影响评价相关法律法规","建筑工程",0,4,50,2507,[13,34,46,58,70,82,94,106,118,130,142,154,166,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,402,414,426,438,450,462,474,486,498,510,522,534,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},887884,1,"单选题","根据《关于进一步加强水生生物资源保护严格环境影响评价管理的通知》（环发[2013]86号），水利工程和开采等建设项目涉及水生生物自然保护区或种质资源保护区的应当按照国家有关规定进行（ ），并将有关报告作为建设项目环境影响报告书的重要内容。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","专题评价或论证",true,{"key":24,"text":25,"correct":26},"B","报告",false,{"key":28,"text":29,"correct":26},"C","详述",{"key":31,"text":32,"correct":26},"D","评价","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},887885,"根据《关于进一步加强水电建设环境保护工作的通知》，（ ）应列为水电项目筹建及准备期工作内容。",[38,40,42,44],{"key":20,"text":39,"correct":26},"河床内导流工程",{"key":24,"text":41,"correct":26},"围堰工程（包括分期围堰）",{"key":28,"text":43,"correct":22},"水生生态保护的相关措施",{"key":31,"text":45,"correct":26},"水电项目筹建及准备期相关工程",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},887886,"依据《建设项目环境保护管理条例》，流域开发、开发区建设、城市新区建设等区域性开发，编制建设规划时，应当编制（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"环境影响报告表",{"key":24,"text":53,"correct":22},"环境影响报告书",{"key":28,"text":55,"correct":26},"环境影响登记表",{"key":31,"text":57,"correct":26},"有关环境影响的篇章或说明",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},887887,"依据环境影响评价法，已经进行了环境影响评价的规划所包含的具体建设项目，其环境影响评价内容（ ）",[62,64,66,68],{"key":20,"text":63,"correct":26},"可以省略",{"key":24,"text":65,"correct":22},"可以简化",{"key":28,"text":67,"correct":26},"不可以简化",{"key":31,"text":69,"correct":26},"应该细化",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},887888,"依据《建设项目环境影响报告表（试行）》，环境影响报告表可不含有（ ）的内容。",[74,76,78,80],{"key":20,"text":75,"correct":22},"公众参与",{"key":24,"text":77,"correct":26},"环境影响分析",{"key":28,"text":79,"correct":26},"建设项目工程分析",{"key":31,"text":81,"correct":26},"环境影响评价结论与建议",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},887889,"根据《关于进一步加强水电建设环境保护工作的通知》，下列关于水电建设项目环境影响评价的说法中，错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"围堰工程和河床内导流工程纳入“三通一平”工程范围",{"key":24,"text":89,"correct":26},"水生生态保护的相关措施应列为水电项目筹建及准备期工作内容",{"key":28,"text":91,"correct":26},"在水电建设项目环境影响评价中要有“三通一平”工程环境影响回顾评价内容",{"key":31,"text":93,"correct":26},"水电项目筹建及准备期相关工程应作为一个整体项目纳入“三通一平”工程开展环境影响评价",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},887890,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》，环境风险识别的要求不包括（ ）的识别。",[98,100,102,104],{"key":20,"text":99,"correct":26},"生产设施和危险物质",{"key":24,"text":101,"correct":22},"环境风险防范措施的有效性",{"key":28,"text":103,"correct":26},"有毒有害物质扩散途径",{"key":31,"text":105,"correct":26},"可能受影响的环境保护目标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},887891,"依据《中华人民共和国环境影响评价法》及其配套的规范性文件，已经进行了环境影响评价的规划所包含的具体建设项目的环境影响评价内容可以简化，关于简化内容的确定，下列说法中正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"由建设单位根据规划环境影响评价的分析论证情况确定",{"key":24,"text":113,"correct":22},"根据规划环境影响评价报告书审查意见中明确的需要简化的具体情况确定",{"key":28,"text":115,"correct":26},"由承担该项目环境影响评价的单位根据规划环境影响评价的分析论证情况确定",{"key":31,"text":117,"correct":26},"由对该项目有审批权的环境保护主管部门根据规划环境影响评价的分析论证情况确定",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},887892,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》，关于环境风险评价的有关要求，下列说法中，错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"经论证，环境风险评价内容不完善的相关建设项目环境影响评价文件不予审批",{"key":24,"text":125,"correct":26},"环境保护行政主管部门对无环境风险评价专章的建设项目环境影响评价文件不予受理",{"key":28,"text":127,"correct":22},"相关建设项目的环境影响评价文件经审批后，环境风险防范措施发生重大变动的，建设单位应按要求重新办理报批手续",{"key":31,"text":129,"correct":26},"环境保护行政主管部门在相关建设项目环境影响评价文件审批中，对存在较大环境风险隐患的，应提出环境影响后评价的要求",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},887893,"依据《中华人民共和国环境影响评价法》，作为一项整体建设项目的规划进行环境影响评价时，下列说法中正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"进行规划的环境影响评价",{"key":24,"text":137,"correct":22},"建设项目的环境影响评价可以简化",{"key":28,"text":139,"correct":26},"规划的环境影响评价内容可适当简化",{"key":31,"text":141,"correct":26},"建设项目环境影响评价应落实规划环境影响评价中提出的要求",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},887894,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》（环发[2012]77号），（ ）要加强环境风险评价工作，并对环境影响评价结论负责。",[146,148,150,152],{"key":20,"text":147,"correct":26},"建设单位及其所属企业",{"key":24,"text":149,"correct":22},"环评单位",{"key":28,"text":151,"correct":26},"环境监理单位",{"key":31,"text":153,"correct":26},"验收监测或验收调查单位",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},887895,"（ ）水生生物自然保护区影响专题评价应当按照农业部《建设项目对水生生物国家级自然保护区影响专题评价管理规范》（农渔发[2009]4号）执行。",[158,160,162,164],{"key":20,"text":159,"correct":26},"地方级",{"key":24,"text":161,"correct":26},"省级",{"key":28,"text":163,"correct":26},"地市级",{"key":31,"text":165,"correct":22},"国家级",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},887896,"根据《关于进一步加强水电建设环境保护工作的通知》，（ ）作为主体工程内容不纳入“三通一平”工程范围。",[170,171,173,174],{"key":20,"text":43,"correct":26},{"key":24,"text":172,"correct":26},"陆生生态系统",{"key":28,"text":45,"correct":26},{"key":31,"text":175,"correct":22},"围堰工程（包括分期围堰）和河床内导流工程",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},887897,"东部甲乙两省交界的某油库原油贮区位于乙省，建设单位拟在甲省扩建入库原油输送能力。根据《建设项目环境影响评价文件分级审批规定》，负责该项目环境影响评价文件审批的是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"环境保护部",{"key":24,"text":183,"correct":26},"甲省环境保护行政主管部门",{"key":28,"text":185,"correct":26},"乙省环境保护行政主管部门",{"key":31,"text":187,"correct":26},"管辖甲、乙两省的环境保护部督察中心",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},887898,"根据《环境保护局建设项目环境影响评价文件审批程序规定》，按照规定实行核准制的建设项目，建设单位应当在（ ）报批环境影响评价文件。",[192,194,196,198],{"key":20,"text":193,"correct":26},"报送可行性研究报告前",{"key":24,"text":195,"correct":22},"提交项目申请报告前",{"key":28,"text":197,"correct":26},"办理备案手续后和开工前",{"key":31,"text":199,"correct":26},"进行项目初步设计前",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},887899,"依据《建设项目环境影响评价文件分级审批规定》，应当由环境保护部负责审批（ ）的环境影响评价文件。",[204,206,208,210],{"key":20,"text":205,"correct":26},"涉及国家级自然保护区的建设项目",{"key":24,"text":207,"correct":26},"垃圾焚烧等可能造成重大环境影响的建设项目",{"key":28,"text":209,"correct":22},"由国务院有关部门备案的对环境可能造成重大影响的特殊性质的建设项目",{"key":31,"text":211,"correct":26},"公众参与中争议较大、省级环境保护行政主管部门认为难以决策的建设项目",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},887900,"某建设项目未依法进行环境影响评价，根据《中华人民共和国环境保护法》，该项目不得（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"开工建设",{"key":24,"text":219,"correct":26},"开展施工准备",{"key":28,"text":221,"correct":26},"予以备案或核准",{"key":31,"text":223,"correct":26},"开展初步设计审查",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},887901,"根据《中华人民共和国环境影响评价法》，下列关于建设项目环境影响评价文件重新报批和重新审核的说法中，正确的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"建设项目投资主体发生变化，建设单位应当重新报批建设项目的环境影响评价文件",{"key":24,"text":231,"correct":22},"建设项目防治污染的措施发生重大变动，建设单位应当重新报批建设项目的环境影响评价文件",{"key":28,"text":233,"correct":26},"建设项目自环境影响评价文件批准之日起五年建成投产，其环境影响文件应当报原审批单位重新审核",{"key":31,"text":235,"correct":26},"建设项目自环境影响评价文件批准之日起三年，方决定该项目开工建设，其环境影响文件应当报原审批单位重新审核",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},887902,"根据《建设项目环境保护管理条例》，环境保护行政主管部门审批环境影响报告书，自收到环境影响报告书之日起（ ）内，作出审批决定并书面通知建设单位。",[240,242,244,246],{"key":20,"text":241,"correct":26},"15日",{"key":24,"text":243,"correct":26},"30日",{"key":28,"text":245,"correct":22},"60日",{"key":31,"text":247,"correct":26},"90日",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},887903,"某保密建设项目，建设地点涉及甲市的乙、丙两个县的行政区域，填报环境影响登记表，根据《建设项目环境影响登记表备案管理办法》，关于该项目环境影响登记表备案管理要求的说法，正确的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":26},"应向甲市环境保护主管部门备案，采用网上备案方式",{"key":24,"text":255,"correct":26},"应向甲市环境保护主管部门备案，采用纸质备案方式",{"key":28,"text":257,"correct":26},"应分别向乙、丙两个县级环境保护主管部门备案，采用网上备案方式",{"key":31,"text":259,"correct":22},"应分别向乙、丙两个县级环境保护主管部门备案，采用纸质备案方式",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},887904,"对超越法定职权、违反法定程序或者条件作出环境影响评价文件审批决定的直接责任人员，依照《环境保护违法违纪行为处分暂行规定》的规定，情节较重的，对直接责任人员，给予（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"记大过处分",{"key":24,"text":267,"correct":22},"降级处分",{"key":28,"text":269,"correct":26},"撤职处分",{"key":31,"text":271,"correct":26},"拘役处分",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},887905,"建设项目的环境影响评价文件自批准之日起超过（ ），该项目方开工建设的，其环境影响评价文件应当报送原审批机关重新审核。",[276,278,280,282],{"key":20,"text":277,"correct":26},"6个月",{"key":24,"text":279,"correct":26},"1年",{"key":28,"text":281,"correct":26},"3年",{"key":31,"text":283,"correct":22},"5年",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},887906,"某热电联产火电机组建设内容发生变动，根据《关于印发环评管理中部分行业建设项目重大变动清单的通知（试行）》，不属于该建设项目重大变动的是（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":26},"冷却方式变化",{"key":24,"text":291,"correct":26},"排烟高度降低",{"key":28,"text":293,"correct":26},"配套灰场重新选址",{"key":31,"text":295,"correct":22},"供热替代量减少10%以下",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},887907,"根据《建设项目环境影响评价文件分级审批规定》，下列建设项目的环境影响评价文件，由环境保护部负责审批的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"核设施建设项目",{"key":24,"text":303,"correct":26},"机密工程建设项目",{"key":28,"text":305,"correct":26},"由国务院备案的建设项目",{"key":31,"text":307,"correct":26},"由国务院有关部门备案的对环境可能造成影响的建设项目",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},887908,"某企业计划建设大型化工项目，根据《中华人民共和国环境影响评价法》和《建设项目环境影响评价文件分级审批规定》，不具有该项目环境影响评价文件审批权限的部门是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"县级环境保护行政主管部门",{"key":24,"text":315,"correct":26},"省级环境保护行政主管部门",{"key":28,"text":317,"correct":26},"地级市环境保护行政主管部门",{"key":31,"text":319,"correct":26},"国务院环境保护行政主管部门",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},887909,"某办公用房环境影响报告表经当地环境保护行政主管部门审批后，建设地点和建设规模均发生了重大变动。根据《中华人民共和国环境影响评价法》，建设单位的下列做法中，正确的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"该建设单位应重新报批办公用房环境影响评价文件",{"key":24,"text":327,"correct":26},"将环境影响报告表重新报该环境保护行政主管部门审核",{"key":28,"text":329,"correct":26},"对办公用房进行跟踪评价，及时采取防治环境污染的措施",{"key":31,"text":331,"correct":26},"在办公用房建成后向该环境保护行政主管部门申请竣工环保验收时出具变更说明",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},887910,"根据《建设项目环境影响评价文件分级审批规定》，下列建设项目中，其环境影响评价文件属于省级环境保护行政主管部门审批的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"铁合金生产项目",{"key":24,"text":339,"correct":26},"核电厂扩建项目",{"key":28,"text":341,"correct":26},"跨省高速公路项目",{"key":31,"text":343,"correct":26},"扩建军民合用机场项目",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},887911,"依据《中华人民共和国环境影响评价法》，应当将建设项目的环境影响评价文件报原审批部门重新审核的情形是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"建设项目的规模发生重大变动",{"key":24,"text":351,"correct":26},"建设项目采用的生产工艺发生重大变动",{"key":28,"text":353,"correct":22},"环境影响评价文件自批准之日起超过五年方决定开工建设",{"key":31,"text":355,"correct":26},"环境影响评价文件自批准之日起超过三年方决定开工建设",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},887912,"依据《建设项目环境保护管理条例》，对于不需要进行可行性研究的建设项目，建设单位报建设项目环境影响评价文件的时间应当是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"建设项目开工后",{"key":24,"text":363,"correct":22},"建设项目开工前",{"key":28,"text":365,"correct":26},"建设项目竣工前",{"key":31,"text":367,"correct":26},"建设项目竣工后",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},887913,"依据《建设项目环境影响评价文件审批程序规定》，下列建设项目中，省级以下环境保护部门无权审批其环境影响评价文件的是（ ）建设项目。",[372,374,376,378],{"key":20,"text":373,"correct":26},"化工",{"key":24,"text":375,"correct":26},"造纸",{"key":28,"text":377,"correct":26},"印染",{"key":31,"text":379,"correct":22},"电石",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},887914,"依据《中华人民共和国环境影响评价法》，建设项目环境影响报告书应当在（ ）报批。",[384,386,388,390],{"key":20,"text":385,"correct":22},"开工建设前",{"key":24,"text":387,"correct":26},"初步设计阶段",{"key":28,"text":389,"correct":26},"可行性研究完成后",{"key":31,"text":391,"correct":26},"初步设计完成前",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},887915,"依据《中华人民共和国环境影响评价法》，有审批权的环境保护行政主管部门应当自收到环境影响报告书之日起（ ）内，作出审批决定并书面通知建设单位。",[396,397,399,401],{"key":20,"text":245,"correct":22},{"key":24,"text":398,"correct":26},"三个月",{"key":28,"text":400,"correct":26},"半年",{"key":31,"text":243,"correct":26},{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},887916,"依据《中华人民共和国环境影响评价法》，建设项目环境影响评价文件自批准之日起超过（ ）年，方决定该项目开工建设的，其环境影响评价文件应当报原审批部门重新审核。",[406,408,410,412],{"key":20,"text":407,"correct":26},"三",{"key":24,"text":409,"correct":26},"四",{"key":28,"text":411,"correct":22},"五",{"key":31,"text":413,"correct":26},"六",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},887917,"依据《中华人民共和国环境影响评价法》，建设项目可能造成的跨行政区域的不良环境影响，有关环境保护行政主管部门对该项目的环境影响评价结论有争议的，其环境影响评价文件由（ ）审批。",[418,420,422,424],{"key":20,"text":419,"correct":26},"共同的上一级行政主管部门",{"key":24,"text":421,"correct":22},"共同的上一级环境保护行政主管部门",{"key":28,"text":423,"correct":26},"上一级环境保护行政主管部门",{"key":31,"text":425,"correct":26},"上一级行业主管部门",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},887918,"依据《建设项目环境保护管理条例》，按照国家有关规定，不需要进行可行性研究的建设项目，建设单位应当在建设项目______报批建设项目环境影响报告书、环境影响报告表或者环境影响登记表；其中，需要办理营业执照的，建设单位应当在______报批建设项目环境影响报告书、环境影响报告表或者环境影响登记表。（ ）",[430,432,434,436],{"key":20,"text":431,"correct":26},"初步设计完成前；办理营业执照前",{"key":24,"text":433,"correct":22},"开工前；办理营业执照前",{"key":28,"text":435,"correct":26},"办理营业执照前；开工前",{"key":31,"text":437,"correct":26},"开工前；开工前",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},887919,"建设项目的环境影响评价文件自批准之日起超过五年，方决定该项目开工建设的，其环境影响评价文件应当报原审批部门（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"重新备案",{"key":24,"text":445,"correct":26},"重新报批",{"key":28,"text":447,"correct":22},"重新审核",{"key":31,"text":449,"correct":26},"报废",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},887920,"对需重新审核的建设项目的环境影响评价文件，原审批机关应当自收到建设项目环境影响评价文件之日起10日内，将审核意见（ ）建设单位。",[454,456,458,460],{"key":20,"text":455,"correct":26},"口头通知",{"key":24,"text":457,"correct":26},"电话通知",{"key":28,"text":459,"correct":22},"书面通知",{"key":31,"text":461,"correct":26},"邮件通知",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},887921,"根据《关于做好环境影响评价制度与排污许可制衔接相关工作的通知》，关于其中涉及环境影响评价有关要求的说法，错误的是（ ）",[466,468,470,472],{"key":20,"text":467,"correct":26},"环境影响评价制度是建设项目的环境准入门槛，是申请排污许可证的前提和重要依据",{"key":24,"text":469,"correct":26},"改扩建项目的环境影响评价，应当将排污许可证执行情况作为现有工程回顾评价的主要依据",{"key":28,"text":471,"correct":22},"分期建设的项目，环境影响报告书以及审批文件应当列明分期建设内容，建设单位根据总允许排放量申请排污许可证",{"key":31,"text":473,"correct":26},"纳入排污许可管理的建设项目，可能造成重大环境影响、应当编制环境影响报告书的，原则上实行排污许可重点管理",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},887922,"依据《关于以改善环境质量为核心加强环境影响评价管理的通知》，关于建立“三挂钩”机制的说法，错误的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"现有工程已经造成明显环境问题，应提出有效的整改方案和“以新带老”措施",{"key":24,"text":481,"correct":22},"对未达到环境质量目标考核要求的地区，依法暂停审批该地区排放相应重点污染物的项目环评文件",{"key":28,"text":483,"correct":26},"对环境质量现状超标的地区，项目拟采取的措施不能满足区域环境质量改善目标管理要求的，依法不予审批其环评文件",{"key":31,"text":485,"correct":26},"对于现有同类型项目环境污染严重，致使环境容量接近承载力的地区，在现有问题整改到位前，依法暂停审批该地区同类行业的项目环评文件",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},887923,"建设项目建设过程中，建设单位对环境影响报告书、环境影响报告表及环境影响评价文件审批部门的审批意见中提出的环境保护对策措施应当（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"分时段实施",{"key":24,"text":493,"correct":22},"同时实施",{"key":28,"text":495,"correct":26},"在主体工程进行前实施",{"key":31,"text":497,"correct":26},"在主体工程完成时实施",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},887924,"根据《排污许可证管理暂行规定》，不属于申请材料是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"排污许可证申请表",{"key":24,"text":505,"correct":26},"有排污单位法定代表人或者实际负责人签字或盖章的承诺书",{"key":28,"text":507,"correct":26},"排污单位按照有关要求进行排污口和监测孔规范化设置的情况说明",{"key":31,"text":509,"correct":22},"建设项目环境影响的情况说明",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},887926,"根据《建设项目环境保护事中事后监督管理办法（试行）》，不属于事中监管依据的是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":26},"环境保护有关法律法规的要求",{"key":24,"text":517,"correct":22},"依法取得的排污许可证",{"key":28,"text":519,"correct":26},"环境保护技术标准规范",{"key":31,"text":521,"correct":26},"经批准的环境影响评价文件及批复文件",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},887927,"根据《关于强化建设项目环境影响评价事中事后监管的实施意见》，关于加强建设项目环境影响评价事中监管的说法，错误的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"对建设单位要重点监督其依法依规履行环评程序、开展公众参与情况",{"key":24,"text":529,"correct":22},"对环保部门要重点检查其对建设项目环境保护“三同时”监督检查情况",{"key":28,"text":531,"correct":26},"对环评单位要重点监督其是否依法依规开展作业，确保环评文件的数据资料真实、分析方法正确、结论科学可信",{"key":31,"text":533,"correct":26},"对技术评估机构要重点检查其技术评估能力、独立对环评文件进行技术评估并依法依规提出评估意见情况，是否存在乱收费行为",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},887928,"根据《建设项目环境保护事中事后监督管理办法（试行）》，下列内容中，不属于建设项目环境保护事中监督管理主要依据的是（ ）。",[538,539,541,543],{"key":20,"text":517,"correct":22},{"key":24,"text":540,"correct":26},"经批准的环境影响评价文件",{"key":28,"text":542,"correct":26},"环境保护有关技术标准规范",{"key":31,"text":515,"correct":26},{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":31,"analysis":33},887929,"根据《建设项目环境保护事中事后监督管理办法（试行）》，不属于事中监督管理内容的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"施工期环境监理和环境监测开展情况",{"key":24,"text":551,"correct":26},"竣工环境保护验收和排污许可证的实施情况",{"key":28,"text":553,"correct":26},"经批环境影响评价文件及批复中提出的环境保护措施落实情况和公开情况",{"key":31,"text":555,"correct":22},"生产经营单位遵守环境保护法律、法规的情况进行监督管理",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},887930,"根据《“十三五”环境影响评价改革实施方案》，“十三五”期间，建设项目在投入生产或者使用前，建设单位应当依据环评文件及其审批意见，委托（ ）编制建设项目环境保护设施竣工验收报告，向社会公开并向环保部门备案。",[560,562,564,566],{"key":20,"text":561,"correct":26},"环保部门",{"key":24,"text":563,"correct":22},"第三方机构",{"key":28,"text":565,"correct":26},"相关企业",{"key":31,"text":567,"correct":26},"提供技术服务的机构",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},887931,"《中华人民共和国环境保护法》规定，建设项目中防治污染的设施，应当与主体工程（ ）使用。",[572,574,576,578],{"key":20,"text":573,"correct":22},"同时设计、同时施工、同时投产使用",{"key":24,"text":575,"correct":26},"同时报批、同时施工、同时使用",{"key":28,"text":577,"correct":26},"同时报批、同时设计、同时施工",{"key":31,"text":579,"correct":26},"同时设计、同时施工、同时验收",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":24,"analysis":33},887932,"根据《中华人民共和国环境保护法》，关于建设项目防治污染设施与主体工程“三同时”的说法，正确的是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":26},"防治污染的设施，应当优先设计、优先施工、优先投入使用",{"key":24,"text":587,"correct":22},"防治污染的设施，应当与主体工程同时设计、同时施工、同时投产使用",{"key":28,"text":589,"correct":26},"防治污染的设施，应当与产生污染的设施同时设计、同时施工、同时投入使用",{"key":31,"text":591,"correct":26},"防治污染的设施，应当纳入公用配套工程进行设计、施工，与主体工程同时投入使用",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":20,"analysis":33},887933,"根据《建设项目竣工环境保护验收暂行办法》，建设项目环境保护竣工环境的责任主体是（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"建设单位",{"key":24,"text":599,"correct":26},"环境保护行政主管部门",{"key":28,"text":601,"correct":26},"受建设项目委托的有能力的监测机构",{"key":31,"text":603,"correct":26},"受建设项目委托的有能力的技术机构",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":24,"analysis":33},887934,"环境保护设施建设是防止产生新的污染，保护环境的重要环节。其中固体废物综合利用设施属于（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":26},"污染控制设施",{"key":24,"text":611,"correct":22},"节约资源和资源回收利用设施",{"key":28,"text":613,"correct":26},"生态保护设施",{"key":31,"text":615,"correct":26},"环境监测设施",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]