[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-574-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":629},{"id":5,"name":6,"category":7,"favorite":8},574,"环境影响评价相关法律法规","建筑工程",0,35,50,2507,[13,35,48,61,74,87,100,110,121,133,146,158,170,182,194,206,218,230,242,254,266,278,290,302,314,330,343,355,367,379,391,403,415,427,439,451,463,475,487,498,510,522,534,546,558,570,582,594,606,618],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},889447,2,"多选题","《中华人民共和国环境影响评价法》就建设项目环境影响评价应当避免与规划环境影响评价相重复的有关规定有（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","已经进行了环境影响评价的规划所包含的具体建设项目，其环境影响评价内容环评单位可以简化",false,{"key":24,"text":25,"correct":26},"B","作为一项整体建设项目的规划，按照建设项目进行环境影响评价，不进行规划的环境影响评价",true,{"key":28,"text":29,"correct":26},"C","已经进行了环境影响评价的规划所包含的具体建设项目，其环境影响评价内容建设单位可以简化",{"key":31,"text":32,"correct":26},"D","建设项目的环境影响评价，应当避免与规划的环境影响评价相重复","BCD","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":47,"analysis":34},889448,"依据《关于进一步加强环境影响评价管理防范环境风险的通知》，环境风险预测设定的最大可信事故应包括项目施工、营运等过程中生产设施（ ）。",[39,41,43,45],{"key":20,"text":40,"correct":26},"发生火灾、爆炸事故",{"key":24,"text":42,"correct":26},"危险物质发生泄漏事故",{"key":28,"text":44,"correct":26},"伴生\u002F次生的危险物质",{"key":31,"text":46,"correct":22},"对保护目标的影响概率","ABC",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":60,"analysis":34},889449,"依据《关于进一步加强环境影响评价管理防范环境风险的通知》，下列关于建设项目环境风险评价的要求，说法错误的有（ ）。",[52,54,56,58],{"key":20,"text":53,"correct":22},"对改、扩建相关建设项目，对现有工程可能存在的环境风险隐患，应提出相应的补救或完善措施，并纳入改、扩建项目“三同时”验收内容",{"key":24,"text":55,"correct":26},"相关建设项目的环境影响评价文件经批准后，环境风险防范设施发生重大变动的，建设单位应按《中华人民共和国环境影响评价法》要求重新审核",{"key":28,"text":57,"correct":26},"对存在较大环境风险隐患的建设项目环境影响评价文件，应提出环境影响后评价的要求",{"key":31,"text":59,"correct":22},"建设项目的环境风险防范设施和应急措施是企业环境风险防范与应急管理体系的组成部分参考答案","BC",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":73,"analysis":34},889450,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》，属于存在较大环境风险隐患相关建设项目的环境监理要求有（ ）。",[65,67,69,71],{"key":20,"text":66,"correct":26},"环境监理报告应作为试生产审查和环保验收的依据之一",{"key":24,"text":68,"correct":26},"未按相关要求落实防范环境风险设施建设的，建设单位应及时纠正、补救",{"key":28,"text":70,"correct":22},"建设单位申请试生产时，应将项目环境监理报告和企业突发环境事件应急预案的备案材料一并提交",{"key":31,"text":72,"correct":26},"建设单位应委托环境监理单位，重点关注项目施工过程中各项防治污染、防止生态破坏及防范环境风险设施的建设情况","ABD",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":86,"analysis":34},889451,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》，环境风险预测设定的最大可信事故应包括（ ）。",[78,80,82,84],{"key":20,"text":79,"correct":26},"项目施工过程中生产设施发生火灾事故",{"key":24,"text":81,"correct":26},"项目施工过程中生产设施发生爆炸事故",{"key":28,"text":83,"correct":26},"项目营运过程中生产设施发生火灾、爆炸事故",{"key":31,"text":85,"correct":26},"项目营运过程中生产设施发生危险物质泄漏事故","ABCD",{"id":88,"libraryId":5,"type":15,"typeLabel":16,"stem":89,"options":90,"answer":99,"analysis":34},889452,"根据《中华人民共和国环境影响评价法》，下列内容中，属于建设项目环境影响报告书的有（ ）。",[91,93,95,97],{"key":20,"text":92,"correct":22},"公众参与",{"key":24,"text":94,"correct":22},"环境风险评价",{"key":28,"text":96,"correct":26},"建设项目周围环境现状",{"key":31,"text":98,"correct":26},"建设项目环境保护措施及其技术、经济论证","CD",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":99,"analysis":34},889453,"根据《中华人民共和国环境影响评价法》，建设项目环境影响报告书应当包括的内容有（ ）。",[104,106,107,109],{"key":20,"text":105,"correct":22},"工程分析",{"key":24,"text":94,"correct":22},{"key":28,"text":108,"correct":26},"建设项目对环境影响的经济损益分析",{"key":31,"text":98,"correct":26},{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":120,"analysis":34},889454,"依据《中华人民共和国环境影响评价法》，建设项目环境影响报告书应当包括的内容有（ ）。",[114,116,117,119],{"key":20,"text":115,"correct":26},"环境影响评价结论",{"key":24,"text":94,"correct":22},{"key":28,"text":118,"correct":26},"对建设项目实施环境监测的建议",{"key":31,"text":108,"correct":26},"ACD",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":33,"analysis":34},889455,"根据《关于进一步加强环境影响评价管理防范风险的通知》，关于建设项目环境风险防范和环境风险评价的有关要求，下列说法中正确的包括（ ）。",[125,127,129,131],{"key":20,"text":126,"correct":22},"建设单位及其上级管理部门是环境风险防范的责任主体",{"key":24,"text":128,"correct":26},"建设项目环境风险评价是相关建设项目环境影响评价文件的重要组成部分",{"key":28,"text":130,"correct":26},"环境影响评价机构加强环境风险评价工作，并对环境影响评价结论负责",{"key":31,"text":132,"correct":26},"各级环保部门在环境影响评价文件审批中应对环境风险防范提出明确要求",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":145,"analysis":34},889456,"根据《关于进一步加强水电建设环境保护工作的通知》，（ ）作为主体工程内容，不纳入“三通一平”工程范围。",[137,139,141,143],{"key":20,"text":138,"correct":26},"围堰工程（包括分期围堰）",{"key":24,"text":140,"correct":22},"水生生态保护的相关措施",{"key":28,"text":142,"correct":22},"水电项目筹建及准备期相关工程",{"key":31,"text":144,"correct":26},"河床内导流工程","AD",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":120,"analysis":34},889457,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》（环发[2012]77号），关于防范建设项目环境风险的有关要求为（ ）。",[150,152,154,156],{"key":20,"text":151,"correct":26},"突出重点，全程监管",{"key":24,"text":153,"correct":22},"全面管理，重点监督",{"key":28,"text":155,"correct":26},"明确责任，强化落实",{"key":31,"text":157,"correct":26},"环境风险评价的有关要求",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":86,"analysis":34},889458,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》（环发[2012]77号），环境风险识别应包括（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":26},"生产设施的识别",{"key":24,"text":165,"correct":26},"危险物质的识别",{"key":28,"text":167,"correct":26},"有毒有害物质扩散途径的识别（如大气环境、水环境、土壤等）",{"key":31,"text":169,"correct":26},"可能受影响的环境保护目标的识别",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":86,"analysis":34},889459,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》（环发[2012]77号），防范建设项目环境风险评价的有关要求的论证重点有（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":26},"提出合理有效的应急措施",{"key":24,"text":177,"correct":26},"科学开展环境风险预测",{"key":28,"text":179,"correct":26},"从环境风险源、扩散途径、保护目标三方面识别环境风险",{"key":31,"text":181,"correct":26},"提出合理有效的环境风险防范",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":86,"analysis":34},889460,"根据《关于进一步加强水电建设环境保护工作的通知》，水电建设项目环境影响评价要重点论证和落实（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":26},"生态流量",{"key":24,"text":189,"correct":26},"水温恢复",{"key":28,"text":191,"correct":26},"鱼类保护",{"key":31,"text":193,"correct":26},"陆生珍稀动植物保护",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":86,"analysis":34},889461,"根据《关于进一步加强环境影响评价管理防范环境风险的通知》，关于防范建设项目环境风险的有关要求，对石油天然气开采，气\u002F液化工仓储及运输、石油化工等重点行业建设项目，应进一步加强环境影响评价管理，针对（ ）等多个阶段实施全过程监管，强化环境风险防范及应急管理要求。",[198,200,202,204],{"key":20,"text":199,"correct":26},"环境影响评价文件编制与审批",{"key":24,"text":201,"correct":26},"工程设计与施工",{"key":28,"text":203,"correct":26},"建设项目试运行",{"key":31,"text":205,"correct":26},"竣工环境保护验收",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":47,"analysis":34},889462,"依据《中华人民共和国环境影响评价法》及相关规定，（ ）必须由国务院环境保护行政主管部门负责审批。",[210,212,214,216],{"key":20,"text":211,"correct":26},"绝密工程的环境影响评价文件",{"key":24,"text":213,"correct":26},"核设施工程的环境影响评价文件",{"key":28,"text":215,"correct":26},"跨省域建设项目的环境影响评价文件",{"key":31,"text":217,"correct":22},"涉及国家级自然保护区建设项目的环境影响评价文件",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":33,"analysis":34},889463,"（ ）等污染较重的建设项目环境影响评价文件应由省级或地级市环境保护部门负责审批。",[222,224,226,228],{"key":20,"text":223,"correct":22},"电石",{"key":24,"text":225,"correct":26},"印染",{"key":28,"text":227,"correct":26},"化工",{"key":31,"text":229,"correct":26},"柠檬酸",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":73,"analysis":34},889464,"依据《中华人民共和国环境影响评价法》，建设项目环境影响评价文件批准后，需要建设单位重新报批环境影响评价文件的情况包括（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":26},"建设项目采取的生产工艺发生重大变化的",{"key":24,"text":237,"correct":26},"建设项目的性质、规模、地点发生重大变化的",{"key":28,"text":239,"correct":22},"建设项目环境影响评价文件自批准之日起三年内未开工建设的",{"key":31,"text":241,"correct":26},"建设项目采用的防治污染、防止生态破坏的措施发生重大变化的",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":33,"analysis":34},889465,"建设项目的环境影响评价文件经批准后，建设项目的（ ）发生重大变动的，建设单位应当重新报批建设项目的环境影响评价文件。",[246,248,250,252],{"key":20,"text":247,"correct":22},"工期",{"key":24,"text":249,"correct":26},"地点",{"key":28,"text":251,"correct":26},"规模",{"key":31,"text":253,"correct":26},"性质",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":73,"analysis":34},889466,"《中华人民共和国环境影响评价法》规定，国务院环境保护行政主管部门负责审批的建设项目的环境影响评价文件包括（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":26},"核设施、绝密工程等特殊性质的建设项目",{"key":24,"text":261,"correct":26},"跨省、自治区、直辖市行政区域的建设项目",{"key":28,"text":263,"correct":22},"可能造成跨行政区域的不良环境影响，有关环境保护行政主管部门对该项目的环境影响评价结论有争议的建设项目",{"key":31,"text":265,"correct":26},"由国务院审批的或者由国务院授权有关部门审批的建设项目",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":33,"analysis":34},889467,"根据《建设项目环境影响评价文件分级审批规定》，省级环境保护部门提出分级审批建议时可参照的原则有（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"按照建设项目投资的大小确定",{"key":24,"text":273,"correct":26},"按照建设项目对环境的影响程度确定",{"key":28,"text":275,"correct":26},"按照建设项目对环境的影响性质确定",{"key":31,"text":277,"correct":26},"按照建设项目审批、核准和备案的权限确定",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":47,"analysis":34},889468,"根据《建设项目环境保护管理条例》，下列情形中，属于环境保护行政主管部门应作出不予批准建设项目环境影响报告书（表）决定的有（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":26},"环境影响评价结论不明确",{"key":24,"text":285,"correct":26},"建设项目的环境影响报告书（表）的基础资料数据明显不实",{"key":28,"text":287,"correct":26},"改建、扩建项目未针对项目原有环境污染提出有效防治措施",{"key":31,"text":289,"correct":22},"建设项目所在区域环境质量未达到国家环境质量标准，建设项目拟采取的措施满足区域环境质量改善目标管理要求",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":73,"analysis":34},889469,"根据《建设项目环境保护管理条例》，下列环境影响报告书（表）内容中，属于环境保护行政主管部门审批应当重点审查的有（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":26},"建设项目的环境可行性",{"key":24,"text":297,"correct":26},"环境保护措施的有效性",{"key":28,"text":299,"correct":22},"基础资料、数据的准确性",{"key":31,"text":301,"correct":26},"环境影响评价结论的科学性",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":47,"analysis":34},889470,"《中华人民共和国环境影响评价法》规定，建设项目建设过程中，建设单位应当同时实施（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"环境影响报告书中提出的环境保护对策措施",{"key":24,"text":309,"correct":26},"环境影响评价文件审批部门审批意见中提出的环境保护对策措施",{"key":28,"text":311,"correct":26},"环境影响报告表中提出的环境保护对策措施",{"key":31,"text":313,"correct":22},"可研报告中提出的环境保护对策措施",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":329,"analysis":34},889471,"依据《建设项目环境保护管理条例》，建设项目配套建设的环境保护设施，必须与主体工程（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":26},"同时施工",{"key":24,"text":321,"correct":26},"同时设计",{"key":28,"text":323,"correct":22},"分阶段施工",{"key":31,"text":325,"correct":22},"分阶段验收",{"key":327,"text":328,"correct":26},"E","同时投产使用","ABE",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":342,"analysis":34},889472,"根据《关于以改善环境质量为核心加强环境影响评价管理的通知》（环评（2016）150号），下列符合“三挂钩”机制的有（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":26},"建立项目环评审批与现有项目环境管理联动机制",{"key":24,"text":337,"correct":22},"建立区域环境质量与现有项目环境管理联动机制",{"key":28,"text":339,"correct":26},"建立项目环评审批与区域环境质量联动机制",{"key":31,"text":341,"correct":22},"建立项目环评审批与未建项目环境管理联动机制","AC",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":86,"analysis":34},889473,"根据《建设项目环境影响后评价管理办法（试行）》，受建设单位或生产经营单位委托，可以承担后评价文件编制工作的机构有（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":26},"大专院校",{"key":24,"text":350,"correct":26},"工程设计单位",{"key":28,"text":352,"correct":26},"相关评估机构",{"key":31,"text":354,"correct":26},"环境影响评价机构",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":73,"analysis":34},889474,"根据《建设项目环境保护事中事后监督管理办法（试行）》，属于事中监督管理的内容有（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":26},"施工期环境监理和环境监测开展情况",{"key":24,"text":362,"correct":26},"竣工环境保护验收和排污许可证的实施情况",{"key":28,"text":364,"correct":22},"开展环境影响后评价及落实相应改进措施的情况",{"key":31,"text":366,"correct":26},"环境保护法律法规的遵守情况和环境保护部门做出的行政处罚决定落实情况",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":86,"analysis":34},889475,"环境保护设施建设是防止产生新的污染，保护环境的重要环节。其中污染控制设施包括（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":26},"水污染物控制设施",{"key":24,"text":374,"correct":26},"除尘设施",{"key":28,"text":376,"correct":26},"隔声设施",{"key":31,"text":378,"correct":26},"固体废物卫生填埋或焚烧设施",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":120,"analysis":34},889476,"根据《建设项目竣工环境保护验收暂行办法》，下列内容中，属于建设项目竣工环境保护验收主要依据的有（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":26},"建设项目竣工环境保护验收技术规范",{"key":24,"text":386,"correct":22},"建设项目环境保护设施工程设计资料",{"key":28,"text":388,"correct":26},"建设项目环境保护相关标准和规范性文件",{"key":31,"text":390,"correct":26},"建设项目环境影响报告书（表）及审批部门审批决定",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":145,"analysis":34},889477,"建设项目竣工环境保护验收中环境监测设施包括（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"水环境监测装置",{"key":24,"text":398,"correct":22},"生态恢复设施",{"key":28,"text":400,"correct":22},"水土流失控制设施",{"key":31,"text":402,"correct":26},"大气监测装置",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":120,"analysis":34},889478,"根据《“十三五”环境影响评价改革实施方案》，“十三五”期间，将建立（ ）的管理机制。",[407,409,411,413],{"key":20,"text":408,"correct":26},"环评",{"key":24,"text":410,"correct":22},"环保竣工验收行政许可",{"key":28,"text":412,"correct":26},"“三同时”",{"key":31,"text":414,"correct":26},"排污许可衔接",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":145,"analysis":34},889479,"根据《建设项目环境影响后评价管理办法（试行）》，（ ）应当开展环境影响后评价。",[419,421,423,425],{"key":20,"text":420,"correct":26},"穿越重要生态环境敏感区的高速公路建设项目",{"key":24,"text":422,"correct":22},"生态原料、工艺和环保措施发生重大变动的化工建设项目",{"key":28,"text":424,"correct":22},"当地环境保护主管部门认为应当开展环境影响后评价的造纸建设项目",{"key":31,"text":426,"correct":26},"有重大环境风险，建设地点敏感，且持续排放持久性有机污染物的冶金建设项目",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":86,"analysis":34},889480,"根据《建设项目环境影响后评价管理办法（试行）》，环境影响后评价文件的主要内容包括（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"建设项目工程评价",{"key":24,"text":434,"correct":26},"区域环境变化评价",{"key":28,"text":436,"correct":26},"环境保护措施有效性评估",{"key":31,"text":438,"correct":26},"环境影响预测验证",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":145,"analysis":34},889481,"根据《中华人民共和国环境影响评价法》，在项目建设、运行过程中产生不符合经审批的环境影响评价文件的情形，下列说法中，正确的有（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":26},"建设单位应当组织环境的后评价，采取改进措施",{"key":24,"text":446,"correct":22},"原环评单位应当组织环境影响的后评价，采取改进措施",{"key":28,"text":448,"correct":22},"建设单位的上级主管部门可以责成建设单位进行环境影响的后评价，采取改进措施",{"key":31,"text":450,"correct":26},"原环境影响评价文件审批部门可以责成建设单位进行环境影响的后评价，采取改进措施",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":73,"analysis":34},889482,"根据《中华人民共和国环境影响评价法》，关于环境影响后评价的规定，下列说法中，正确的有（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":26},"在项目建设过程中产生不符合经审批的环境影响评价文件的情形的，建设单位应当组织环境影响的后评价，采取改进措施",{"key":24,"text":458,"correct":26},"在项目运行过程中产生不符合经审批的环境影响评价文件的情形的，建设单位应当组织环境影响的后评价，采取改进措施",{"key":28,"text":460,"correct":22},"在项目关闭过程中产生不符合经审批的环境影响评价文件的情形的，建设单位应当组织环境影响的后评价，采取改进措施",{"key":31,"text":462,"correct":26},"在项目建设过程中产生不符合经审批的环境影响评价文件的情形的，原环境影响评价文件审批部门可以责成建设单位进行环境影响的后评价，采取改进措施",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":120,"analysis":34},889483,"根据《中华人民共和国环境影响评价法》，属于“产生不符合经审批的环境影响评价文件的情形”的是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":26},"建设、运行过程中，当地人民政府对项目所涉及区域的环境功能做出重大调整，要求建设单位进行后评价的",{"key":24,"text":470,"correct":22},"在建设、运行过程中，虽然周边环境敏感点未发生变化，但由于建设项目的选址、选线发生较大变化，从而可能对环境影响评价预测情况产生影响",{"key":28,"text":472,"correct":26},"项目长期性、累积性和不确定性环境影响突出，有重大环境风险或者穿越重要生态环境敏感区的重大项目",{"key":31,"text":474,"correct":26},"跨行政区域、存在争议的",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":120,"analysis":34},889484,"某建设项目环境影响评价文件自批准之日起超过五年方决定开工建设，且未按规定报原审批部门重新审核，依据《中华人民共和国环境影响评价法》，应由县级以上环境保护行政主管部门进行处罚，处罚形式包括（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":26},"责令停止建设",{"key":24,"text":482,"correct":22},"处建设项目总投资额百分之五以上的罚款",{"key":28,"text":484,"correct":26},"处建设项目总投资额百分之一以上百分之五以下的罚款，并可以责令恢复原状",{"key":31,"text":486,"correct":26},"对建设单位直接负责的主管人员和其他直接责任人员，依法给予行政处分",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":73,"analysis":34},889485,"依据《中华人民共和国环境影响评价法》，建设单位未依法报批建设项目环境影响报告书、报告表，或者未依照规定重新报批或者报请重新审核环境影响报告书、报告表，擅自开工建设的，由县级以上环境保护行政主管部门进行处罚的形式有（ ）。",[491,492,494,496],{"key":20,"text":480,"correct":26},{"key":24,"text":493,"correct":26},"处建设项目总投资额1%以上5%以下的罚款",{"key":28,"text":495,"correct":22},"对该建设项目的环评单位给予行政处分",{"key":31,"text":497,"correct":26},"对建设单位直接负责的主管人员，依法给予行政处分",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":47,"analysis":34},889486,"下列属于违法批准建设项目环境影响评价文件的有（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"未按分类管理规定编报环境影响评价文件而受理批准的",{"key":24,"text":505,"correct":26},"环境影响评价文件有严重漏项或错误，批准后建设项目实施造成重大环境影响和经济损失的",{"key":28,"text":507,"correct":26},"应征求公众意见而未征求，造成环境影响和不良社会影响的",{"key":31,"text":509,"correct":22},"依照有关的技术规范要求编制环境影响评价文件",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":33,"analysis":34},889487,"下列（ ）行为不符合建设项目环境影响评价工作的机构及其环境影响评价技术人员的行为准则。",[514,516,518,520],{"key":20,"text":515,"correct":22},"不得违反国家产业政策以及国家禁止建设的建设项目进行环境影响评价",{"key":24,"text":517,"correct":26},"在本单位环境影响评价资质等级、评价范围内，因没有兴趣拒绝承担某项目环境影响评价工作",{"key":28,"text":519,"correct":26},"转让环境影响评价资质证书给其他环评单位从事环境影响评价工作",{"key":31,"text":521,"correct":26},"评价机构及评价编写人员应当对环境影响评价结论负责",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":86,"analysis":34},889489,"根据《环境影响评价从业人员职业道德规范（试行）》，环境影响评价从业人员应当坚持做到（ ）",[526,528,530,532],{"key":20,"text":527,"correct":26},"依法遵规",{"key":24,"text":529,"correct":26},"公正诚信",{"key":28,"text":531,"correct":26},"忠于职守",{"key":31,"text":533,"correct":26},"廉洁自律",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":86,"analysis":34},889490,"根据《关于以改善环境质量为核心加强环境影响评价管理的通知》，“三线一单”约束是指( )。",[538,540,542,544],{"key":20,"text":539,"correct":26},"生态保护红线",{"key":24,"text":541,"correct":26},"环境质量底线",{"key":28,"text":543,"correct":26},"资源利用上线",{"key":31,"text":545,"correct":26},"环境准入负面清单",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":73,"analysis":34},889491,"根据《建设项目环境影响登记表备案管理办法》，关于建设项目环境影响登记表备案说法，错误的是( )。",[550,552,554,556],{"key":20,"text":551,"correct":26},"对国家规定需要保密的建设项目，建设项目环境影响登记表无需备案",{"key":24,"text":553,"correct":26},"各地环境保护行政主管部门需设立建设项目环境影响登记表网上备案系统",{"key":28,"text":555,"correct":22},"建设单位应当在建设项目建成并投入生产运营前，登录网上备案系统，在网上备案系统注册真实信息，在线填报并提交建设项目环境影响登记表",{"key":31,"text":557,"correct":26},"网上备案时，建设单位的法定代表人或者主要负责人无需签署姓名",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":86,"analysis":34},889492,"根据《建设项目竣工环境保护验收暂行办法》，以下以属于环境保护设施的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":26},"防治环境污染的设备",{"key":24,"text":565,"correct":26},"防治生态破坏的设备",{"key":28,"text":567,"correct":26},"开展环境监测所需的装置",{"key":31,"text":569,"correct":26},"开展环境监测的工程设施",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":47,"analysis":34},889493,"根据《关于以改善环境质量为核心加强环境影响评价管理的通知》下列说法中，错误的有( )。",[574,576,578,580],{"key":20,"text":575,"correct":26},"禁止在优先保护类耕地集中区域新建制革项目",{"key":24,"text":577,"correct":26},"对环境质量现状超标的地区，依法不予审批该地区建设项目环评文件",{"key":28,"text":579,"correct":26},"对未达到环境质量目标考核要求的地区，依法暂停审批该地区新增排放污染物的项目环评文件",{"key":31,"text":581,"correct":22},"对于现有同类型项目环境污染严重，致使环境容量接近承载能力的地区在现有问题整改到位前，依法暂停审批该地区新建同类行业的项目环评文件",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":47,"analysis":34},889494,"根据《排污许可管理办法（试行）》 核发环保部门按照（ ）确定排污单位的许可排放量。",[586,588,590,592],{"key":20,"text":587,"correct":26},"排污许可证申请",{"key":24,"text":589,"correct":26},"核发技术规范规定的行业重点污染物允许排放量核算方法，",{"key":28,"text":591,"correct":26},"环境质量改善的要求",{"key":31,"text":593,"correct":22},"企业所交的金额",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":33,"analysis":34},889495,"依据《建设项目环境保护管理条例》，建设项目的初步设计，应当按照环境保护设计规范的要求，编制环境保护篇章，并依据经批准的环境影响评价文件，在环境保护篇章中提出（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"后评价计划",{"key":24,"text":601,"correct":26},"防治环境污染的措施",{"key":28,"text":603,"correct":26},"防治生态破坏的措施",{"key":31,"text":605,"correct":26},"环境保护设施投资概算",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":60,"analysis":34},889496,"评价机构应当按照相应环境影响的（ ）承担环境影响评价工作，不得无任何正当理由拒绝承担环境影响评价工作。",[610,612,614,616],{"key":20,"text":611,"correct":22},"评价规范",{"key":24,"text":613,"correct":26},"评价范围",{"key":28,"text":615,"correct":26},"评价资质等级",{"key":31,"text":617,"correct":22},"评价原则",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":99,"analysis":34},889497,"根据《关于进一步加强水电建设环境保护工作的通知》，下列水电工程中，属于应纳入“三通一平”工程开展环境影响评价的有（ ）。",[622,624,625,627],{"key":20,"text":623,"correct":22},"围堰工程",{"key":24,"text":144,"correct":22},{"key":28,"text":626,"correct":26},"筹建及准备期相关工程",{"key":31,"text":628,"correct":26},"水生生态保护的相关工程措施",[630,634,637,640,643,646],{"id":631,"name":632,"category":7,"favorite":633},1,"领导干部任职前廉政法规知识测试题",92,{"id":635,"name":636,"category":7,"favorite":631},595,"建筑结构与设备",{"id":638,"name":639,"category":7,"favorite":631},715,"招标采购专业知识与法律法规",{"id":641,"name":642,"category":7,"favorite":631},848,"市政方向-通用基础",{"id":644,"name":645,"category":7,"favorite":8},534,"BIM工程师",{"id":647,"name":645,"category":7,"favorite":8},535]