[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-574-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":573},{"id":5,"name":6,"category":7,"favorite":8},574,"环境影响评价相关法律法规","建筑工程",0,28,50,2507,[13,34,46,58,70,82,90,102,114,126,135,144,156,168,176,188,200,212,220,232,244,256,268,278,290,302,314,326,338,347,359,371,383,392,400,411,419,428,440,452,463,475,486,495,505,513,525,537,549,561],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},889095,1,"单选题","2018-58、根据《中华人民共和国放射性污染防治法》，关于编制和实施放射性固体废物处置场所选址规划的说法，正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","国务院核设施主管部门会同省级人民政府根据地质条件和放射性固体废物处置的需要，在环境影响评价的基础上编制，报国务院批准后实施",false,{"key":24,"text":25,"correct":22},"B","国务院核设施主管部门会同省级人民政府根据土地利用规划和放射性固体废物处置的需要，在环境影响评价的基础上编制，报国务院批准后实施",{"key":27,"text":28,"correct":29},"C","国务院核设施主管部门会同国务院环境保护行政主管部门根据地质条件和放射性固体废物处置的需要，在环境影响评价的基础上编制，报国务院批准后实施",true,{"key":31,"text":32,"correct":22},"D","国务院核设施主管部门会同国务院环境保护行政主管部门根据土地利用规划和放射性固体废物处置的需要，在坏境影响评价的基础重编制报国务院批准后实施","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},889096,"根据《中华人民共和国放射性污染防治法》核设施进行环境影响评价的有关规定，下列说法中，正确的是( ) 。",[38,40,42,44],{"key":20,"text":39,"correct":22},"在办理核设施选址审批手续后，应当编制环境影响报告书，报国务院环境保护行政主管部门审查批准",{"key":24,"text":41,"correct":29},"核设施营运单位应在办理核设施退役审批手续前编制环境影响报告书，并报国务院环境保护行政主管部门审查批准",{"key":27,"text":43,"correct":22},"核设施营运单位应在申请领取运行许可证前编制环境影响报告书，报省级以上人民政府环境保护行政主管部门审查批准",{"key":31,"text":45,"correct":22},"核设施营运单位应在领取核设施建造许可证前编制环境影响报告书，报省级以上人民政府环境保护行政主管部门审查批准",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},889097,"根据《中国人民共和国放射性污染防治法》，关于产生放射性废液的单位排放或处理、贮存放射性废液有关规定的说法，错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"禁止向海洋排放放射性废液",{"key":24,"text":53,"correct":22},"禁止利用溶洞排放放射性废液",{"key":27,"text":55,"correct":22},"禁止利用天然裂隙排放放射性废液",{"key":31,"text":57,"correct":22},"产生放射性废液的单位，必须按照国家放射性污染防治标准的要求，对不得向环境排放的放射性废液进行处理或者贮存",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},889098,"根据《中华人民共和国放射性污染防治法》关于“放射性固体废物处置方式及编制处置设施选址规划”的规定，下列说法中，正确的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":29},"放射性固体废物处置场所选址规划须报国务院批准后实施",{"key":24,"text":65,"correct":22},"放射性固体废物应当在符合国家规定的区域内实行近地表处置",{"key":27,"text":67,"correct":22},"在内河水域处置放射性固体废物，必须符合国家有关放射性污染标准的要求",{"key":31,"text":69,"correct":22},"负责放射性固体废物处置场所规划编制的牵头单位，应当是国务院环境保护行政主管部门",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},889099,"根据《中华人民共和国放射性污染防治法》放射性固体废物处置的有关规定，下列说法中，错误的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"放射性固体废物实行有偿处置",{"key":24,"text":77,"correct":22},"放射性固体废物处置实行经营许可",{"key":27,"text":79,"correct":29},"放射性固体废物处置费用收取和使用管理办法，由国务院环境保护行政主管部门规定",{"key":31,"text":81,"correct":22},"产生放射性固体废物的单位，应当按照国务院环境保护行政主管部门的规定，对其产生的放射性固体废物进行处理后，送交放射性固体废物处置单位处置，并承担处置费用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},889100,"2016-56.根据《中华人民共和国放射性污染防治法》关于“放射性固体废物处置方式及编制处理设施选址规划”的规定，下列说法中，正确的是（ ）。",[86,87,88,89],{"key":20,"text":63,"correct":29},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":20,"analysis":33},889101,"2014-56.根据《中华人民共和国放射性污染防治法》放射性固体废物处理处置的有关规定，下列说法中，错误的是( )。",[94,96,98,100],{"key":20,"text":95,"correct":29},"设立专门从事放射性固体废物贮存、处置的单位，须经国务院核设施主管部门审查批准，取得许可证",{"key":24,"text":97,"correct":22},"伴生放射性稀土矿开发利用过程中产生的尾矿，应当建设尾矿库进行贮存、处置，建造的尾矿库应符合放射性污染防治的要求",{"key":27,"text":99,"correct":22},"产生放射性固体废物的单位，应按照国家有关规定，对其产生的放射性固体废物进行处理后，送交放射性固体废物处置单位处置，并承担处置费用",{"key":31,"text":101,"correct":22},"国务院核设施主管部门会同国务院环境保护行政主管部门根据地质条件和放射性固体废物处置需要，在环境影响评价的基础上编制放射性固体废物处置场所选址规划，报国务院批准后实施",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},889102,"2017-48.根据《中华人民共和国放射性污染防治法》核设施进行环境影响评价的有关规定，下列说法中，正确的是（ ）",[106,108,110,112],{"key":20,"text":107,"correct":22},"在办理核设施选址审批后，应当编制环境影响报告书，报国务院环境保护行政主管部门审查批准",{"key":24,"text":109,"correct":29},"核设施运营单位应在办理核设施退役审批手续编制环境影响报告书，并报国务院环境保护行政主管部门审查批准",{"key":27,"text":111,"correct":22},"核设施运营单位应在申请领取运行许可证前编制环境影响报告书，报省级以上人民政府环境保护行政主管部门审查批准",{"key":31,"text":113,"correct":22},"核设施运营单位应在领取核设施建造许可证前编制环境影响报告书，报省级以上人民政府环境保护行政主管部门审查批准",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},889103,"2013-54．根据《中华人民共和国放射性污染防治法》，低、中水平放射性固体废物在符合国家规定的区域实行（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"海洋上处置",{"key":24,"text":121,"correct":29},"近地表处理",{"key":27,"text":123,"correct":22},"内河水域处置",{"key":31,"text":125,"correct":22},"集中的深地质处置",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":27,"analysis":33},889104,"2018-58、根据《中华人民共和国放射性污染防治法》，关于编制和实施放射性固体废物处置场所选址规划的说法，正确的是( )。",[130,131,132,133],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":134,"correct":22},"国务院核设施主管部门会同国务院环境保护行政主管部门根据士地利用规划和放射性固体废物处置的需要，在坏境影响评价的基础重编制报国务院批准后实施",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":27,"analysis":33},889105,"2016-57.根据《中华人民共和国放射性污染防治法》放射性固体废物处置的有关规定，下列说法中，错误的是（）",[139,140,141,142],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":143,"correct":22},"产生放射性固体废物的单位，应当按照国务院环境保护行政主管部门的规定，对其产生的放射性固体废物进行处理后，送交放射性固体废物处置单位处置，并承担费用",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":31,"analysis":33},889106,"2013-55．根据《中华人民共和国放射性污染防治法》，关于产生放射性固体废物的单位处理处置放射性固体废物的规定，下列说法中，错误的是（ ）。",[148,150,152,154],{"key":20,"text":149,"correct":22},"禁止将放射性固体废物提供或者委托给无许可证的单位贮存和处置",{"key":24,"text":151,"correct":22},"专门从事放射性固体废物贮存处置的单位，须经国务院环境保护行政主管部门审查批准，并取得许可证",{"key":27,"text":153,"correct":22},"产生放射性固体废物的单位，对其按规定送交放射性固体废物处置单位处置的放射性固体废物承担处置费用",{"key":31,"text":155,"correct":29},"产生放射性固体废物的单位，应当按照国务院环境保护行政主管部门的规定，直接将放射性固体废物送交放射性固体废物处理单位处置",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":31,"analysis":33},889107,"2012-45.根据《中华人民共和国放射性污染防治法》，产生放射性固体废物的单位，应当按照（ ）的规定，对其产生的放射性固体废物进行处理后，送交放射性固体废物处置单位处置，并承相处置费用。",[160,162,164,166],{"key":20,"text":161,"correct":22},"所在地市级人民政府",{"key":24,"text":163,"correct":22},"所在地省级人民政府",{"key":27,"text":165,"correct":22},"所在地省级环境保护行政主管部门",{"key":31,"text":167,"correct":29},"国务院环境保护行政主管部门",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":24,"analysis":33},889108,"2017-48、根据《中华人民共和国放射性污染防治法》核设施进行环境影响评价的有关规定，下列说法中，正确的是（ ）",[172,173,174,175],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},889109,"2019-60、根据《中华人民共和国放射性污染防治法》开发利用或关闭铀(针)矿前进行环境影响评价的有关规定，下列说法中，错误的是（ ）",[180,182,184,186],{"key":20,"text":181,"correct":22},"关闭铺(针矿的单位，应当在办理退役审批手续前编制环境影响报告书，报国务院生态环境主管部门审查批准",{"key":24,"text":183,"correct":29},"开发利用伴生放射性矿的单位，应当在办理退役审批手续前编制环境影响报告书，报国务院生态环境主管部门审查批准",{"key":27,"text":185,"correct":22},"开发利用伴生放射性矿的单位，应当在申请领取采矿许可证前编制环境影响报告书，报省级以上人民政府生态环境主管部门审查批准",{"key":31,"text":187,"correct":22},"开发利用铀(钍)矿的单位，应当在申请领取采矿许可证前编制环境影响报告书，报国务院生态环境主管部门审查批准",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},889110,"2019-59、根据《中华人民共和国放射性污染防治法》，下列关于放射性固体废物处置的说法中，正确的是( )。",[192,194,196,198],{"key":20,"text":193,"correct":22},"产生放射性固体废物的单位，可将其产生的放射性固体废物直接送交放射性固体废物处置单位处置",{"key":24,"text":195,"correct":29},"放射性固体废物处置单位处置放射性固体废物需要产生放射性固体废物的单位承担处置费用",{"key":27,"text":197,"correct":22},"产生放射性固体废物的单位，将其产生的放射性固体废物送交放射性固体废物处置单位处置前，必要的话要进行处理",{"key":31,"text":199,"correct":22},"产生放射性固体废物的单位，将其产生的放射性固体废物送交放射性固体废物处置单位处置前进行处理的，可不必承担处置费用",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},889111,"2016-55.根据《中华人民共和国放射性污染防治法》关于环境影响评价的有关规定，下列说法中，正确的是（）",[204,206,208,210],{"key":20,"text":205,"correct":29},"在办理核设施选址审批手续前，应当编制环境影响报告书，报国务院环境保护行政主管部门审查批准",{"key":24,"text":207,"correct":22},"核设施运营单位应当在办理退役审批手续前编制环境影响报告书，报省级以上人民政府环境保护行政主管部门审查批准",{"key":27,"text":209,"correct":22},"开发利用伴生放射线矿的单位，应当在申请领取采矿许可证前编制环境影响报告书，报国务院环境保护行政主管部门审查批准",{"key":31,"text":211,"correct":22},"关闭铀（钍）矿的单位，应当在办理退役审批手续前编制环境影响报告书，报省级以上人民政府环境保护行政主管部门审查批准",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},889112,"2018-57、根据《中华人民共和国放射性污染防治法》，关于产生放射性废液的单位排放或者处理、贮存放射性废液有关规定的说法，错误的是（ ）。",[216,217,218,219],{"key":20,"text":51,"correct":29},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":31,"text":57,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},889113,"2019-61、根据《中华人民共和国清洁生产促进法》，关于企业在进行技术改造中应当采取清洁生产措施的规定，下列不符合相关规定的是( )。",[224,226,228,230],{"key":20,"text":225,"correct":22},"企业污染防治技术升级，满足达标排放和总量控制要求",{"key":24,"text":227,"correct":22},"企业生产废水处理后回用",{"key":27,"text":229,"correct":22},"企业把单效蒸发升级改造为三效蒸发",{"key":31,"text":231,"correct":29},"企业采用产量高但资源利用率低、污染物产生量多的工艺和设备",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":27,"analysis":33},889114,"根据《中华人民共和国清洁生产促进法》，关于企业在进行技术改造中应当采取清洁生产措施的规定，下列不符合相关规定的是()。",[236,238,240,242],{"key":20,"text":237,"correct":22},"节水马桶",{"key":24,"text":239,"correct":22},"简化包装",{"key":27,"text":241,"correct":29},"酒店增大一次性筷子使用量",{"key":31,"text":243,"correct":22},"低噪音空调系统.",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":24,"analysis":33},889115,"《中华人民共和国清洁生产促进法》规定:国家对浪费资源和严重污染环境的落后生产技术、工艺、设备和产品实行( )制度。",[248,250,252,254],{"key":20,"text":249,"correct":22},"定期淘汰",{"key":24,"text":251,"correct":29},"限期淘汰",{"key":27,"text":253,"correct":22},"限期整顿",{"key":31,"text":255,"correct":22},"限期整治",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},889116,"根据《中华人民共和国清洁生产促进法》，下列措施中，属于企业在技术改造过程中应当采取的清洁生产措施的是( )。",[260,262,264,266],{"key":20,"text":261,"correct":22},"为提高产品质量引|进生产工艺",{"key":24,"text":263,"correct":22},"为提高矿石开采量弓|进先进采矿工艺",{"key":27,"text":265,"correct":29},"为减少废气污染物排放量采用替代能源",{"key":31,"text":267,"correct":22},"为大幅度增加产品产量调整产品生产工序",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":27,"analysis":33},889117,"2018-59、根据《中华人民共和国清洁生产促进法》，下列措施中，属于企业技术改造过程中应当采取的清洁生产措施的是（ ）。",[272,274,276,277],{"key":20,"text":273,"correct":22},"为提高产品质量改造生产工艺",{"key":24,"text":275,"correct":22},"为提高矿石开采量引进先进采矿工艺",{"key":27,"text":265,"correct":29},{"key":31,"text":267,"correct":22},{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":27,"analysis":33},889118,"2018-60、根据《中华人民共和国水法》，关于水资源开发利用中生态环境保护有关规定的说法，错误的是（ ）",[282,284,286,288],{"key":20,"text":283,"correct":22},"在干旱、半干旱地区开发、利用水资源，应当充分考虑生态环境用水需要",{"key":24,"text":285,"correct":22},"建设水力发电站，应当保护生态环境，兼顾防洪、供水、灌溉、航运、竹木流放和渔业等方面的需要",{"key":27,"text":287,"correct":29},"开发利用水资源，应当首先满足生态环境用水，并兼顾农业、工业、城市居民生活用水以及航运等需要",{"key":31,"text":289,"correct":22},"跨流域调水，应当进行全面规划和科学论证，统筹兼顾调出和调入流域的用水需求，防止对生态环境造成破坏",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":31,"analysis":33},889119,"2018-129、 根据《中华人民共和国水法》，关于建立饮用水水源保护区制度及设置、新建、改建或者扩大排污口有关规定的说法，错误的有( )",[294,296,298,300],{"key":20,"text":295,"correct":22},"国家建立饮用水水源保护区制度",{"key":24,"text":297,"correct":22},"禁止在饮用水水源保护区内设置排污口",{"key":27,"text":299,"correct":22},"在江河新建排污口，应该经过有管辖权的水行政主管部门或者流域管理机构同意",{"key":31,"text":301,"correct":29},"省级人民政府应当划定饮用水水源保护区，并采取措施，防止水源枯竭和水体污染，保证生产、生活、生态用水需要",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},889120,"2019-62、根据《中华人民共和国水法》， （ ）应当划定饮用水水源保护区。",[306,308,310,312],{"key":20,"text":307,"correct":29},"省级人民政府",{"key":24,"text":309,"correct":22},"县级以上人民政府",{"key":27,"text":311,"correct":22},"县级以上人民政府水行政主管部门",{"key":31,"text":313,"correct":22},"国务院水行政主管部门",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":31,"analysis":33},889121,"2019-64、 根据《中华人民共和国水法》，下列说法错误的是（ ）",[318,320,322,324],{"key":20,"text":319,"correct":22},"禁止在江河、满泊、水库、运河、渠道内种植阻碍行洪的高杆作物",{"key":24,"text":321,"correct":22},"禁止在河道管理范围内从事影响河势稳定、危害河岸堤防安全和其他妨碍河道行洪的活动",{"key":27,"text":323,"correct":22},"国家实行河道采砂许可制度",{"key":31,"text":325,"correct":29},"在河道管理范围内采砂，影响河势稳定或者危及堤防安全的，有关县级以上人民政府应当划定禁采区和规定禁采期",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},889122,"根据《中华人民共和国水法》，关于新建排污口有关规定的说法，正确的是()。",[330,332,334,336],{"key":20,"text":331,"correct":22},"在江河、湖泊新建排污口应该经过河道管理机关同意",{"key":24,"text":333,"correct":22},"在江河、湖泊新建排污口应该经过县级以上水行政主管部门同意",{"key":27,"text":335,"correct":22},"在江河、湖泊新建排污口应该经过市级上水行政主管部门门同意",{"key":31,"text":337,"correct":29},"在江河、湖泊新建排污口应该经过有管辖权的水行政主管部门]或流域管理机构同意",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},889123,"根据《中华人民共和国水法》( ) 应当划定饮用水源保护区。",[342,343,344,345],{"key":20,"text":307,"correct":29},{"key":24,"text":309,"correct":22},{"key":27,"text":311,"correct":22},{"key":31,"text":346,"correct":22},"省级人民政府环境保护主管部门",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":24,"analysis":33},889124,"根据《中华人民共和国水法》，关于排污口的说法中正确的是( )。",[351,353,355,357],{"key":20,"text":352,"correct":22},"限制在江河湖泊改建或者扩大排污口",{"key":24,"text":354,"correct":29},"禁止在一-级饮用水水源保护区内设置排污口",{"key":27,"text":356,"correct":22},"在江河湖泊改建或者扩大排污口，应当经过所在地水行政部门]和流域管理机构的同意",{"key":31,"text":358,"correct":22},"在饮用水水源准保护区内设置排污口，应当经过所在地水行政主管部门]和流域管理机构的同意",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":27,"analysis":33},889125,"根据《中华人民共和国水法》，关于水资源开发利用中生态环境保护有关规定的说法，错误的是( )。",[363,365,367,369],{"key":20,"text":364,"correct":22},"在干旱和半干旱地区开发、利用水资源，应当充分考虑生态环境用水需要",{"key":24,"text":366,"correct":22},"建设水力发电站，应当保护生态环境,兼顾防洪、供水、灌溉、航运、竹木流放和渔业等方面的需要",{"key":27,"text":368,"correct":29},"开发、利用水资源，应当首先满足生态环境用水，并兼顾工业、农业、城乡居民生活用水以及航运等需要",{"key":31,"text":370,"correct":22},"跨流域调水，应当进行全面规划和科学论证，统筹兼顾调出和调入流域的用水需要，防止对生态环境造成破坏",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":27,"analysis":33},889126,"根据《中华人民共和国水法》，在干旱半干旱地区开发水资源，应当充分考虑( )需要。",[375,377,379,381],{"key":20,"text":376,"correct":22},"工业用水",{"key":24,"text":378,"correct":22},"农业用水",{"key":27,"text":380,"correct":29},"生态环境用水",{"key":31,"text":382,"correct":22},"城乡居民生活用水",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":27,"analysis":33},889127,"2016-59.根据《中华人民共和国水法》，在干旱和半干旱地区开发、利用水资源，应当充分考虑（ ）要求。",[387,388,389,390],{"key":20,"text":376,"correct":22},{"key":24,"text":378,"correct":22},{"key":27,"text":380,"correct":29},{"key":31,"text":391,"correct":22},"城乡居民用水",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},889128,"2012-50.根据《中华人民共和国水法》，应当首先满足（ ）。",[396,397,398,399],{"key":20,"text":378,"correct":22},{"key":24,"text":376,"correct":22},{"key":27,"text":380,"correct":22},{"key":31,"text":382,"correct":29},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},889129,"2014-59．根据《中华人民共和国水法》，关于水资源开发利用的规定，下列说法中，错误的是（ ）。",[404,406,408,409],{"key":20,"text":405,"correct":22},"国家鼓励开发利用水能、水运资源",{"key":24,"text":407,"correct":29},"开发、利用水资源，应当首先满足农业、工业、生态环境用水的需要",{"key":27,"text":370,"correct":22},{"key":31,"text":410,"correct":22},"开发、利用水资源，应当坚持兴利与除害相结合，兼顾上下游、左右岸和有关地区之间的利益，充分发挥水资源的综合效益，并服从防洪的总体安排",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":27,"analysis":33},889130,"2018-60、根据《中华人民共和国水法》，关于水资源开发利用中生态环境保护有关规定的说法，错误的是（ ）。",[415,416,417,418],{"key":20,"text":283,"correct":22},{"key":24,"text":285,"correct":22},{"key":27,"text":287,"correct":29},{"key":31,"text":289,"correct":22},{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},889131,"2018-129、根据《中华人民共和国水法》，关于建立饮用水水源保护区制度及设置、新建、改建或者扩大排污口有关规定的说法，错误的有( ）。",[423,424,425,427],{"key":20,"text":295,"correct":22},{"key":24,"text":297,"correct":22},{"key":27,"text":426,"correct":22},"在江河新建排污口，应该经过有管辖权的水行政主管部门]或者流域管理机构同意",{"key":31,"text":301,"correct":29},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},889132,"2016-60.根据《中华人民共和国水法》，关于设置、新建、改建或者扩大排污口的有关规定，以下说法正确的是（）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"限制在江河、湖泊改建或者扩大排污口",{"key":24,"text":435,"correct":29},"禁止在饮用水水源一级保护区内设置排污口",{"key":27,"text":437,"correct":22},"在江河、湖泊新建、改建或者扩大排污口，应当经所在地水行政部门和流域管理机构的同意",{"key":31,"text":439,"correct":22},"在饮用水水源准保护区内设置排污口，应当经所在地水行政部门和流域管理机构的同意",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},889133,"依据《中华人民共和国水法》，国家鼓励开发、利用水能资源，在水能丰富的河流，应当有计划进行（ ）",[444,446,448,450],{"key":20,"text":445,"correct":22},"以航运为目标的梯级开发",{"key":24,"text":447,"correct":22},"以生态保护为目标的梯级开发",{"key":27,"text":449,"correct":29},"多目标梯级开发",{"key":31,"text":451,"correct":22},"以水能资源开发为目标的梯级开发",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},889134,"2018-64、根据《中华人民共和国水法》，关于新建排污口有关规定的说法，正确的是( )。",[456,457,459,461],{"key":20,"text":331,"correct":22},{"key":24,"text":458,"correct":22},"在江河、 湖泊新建排污口应该经过县级以上水行政主管部门同意",{"key":27,"text":460,"correct":22},"在江河、湖泊新建排污口应该经过市级以上水行政主管部门同意",{"key":31,"text":462,"correct":29},"在江河、湖泊新建排污口应该经过有管辖权的水行政主管部门或流域管理机构同意",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},889135,"2019-63、 根据《中华人民共和国水法》，下列说法错误的是（ ）",[467,469,471,473],{"key":20,"text":468,"correct":22},"禁止围湖造地",{"key":24,"text":470,"correct":22},"在水工程保护范围内，禁止从事影响水工程运行和危害水工程安全的采石、取土等活动",{"key":27,"text":472,"correct":22},"单位和个人不得侵占、 毁坏提防、护岸、防讯、水文地质监测等工程设施",{"key":31,"text":474,"correct":29},"确需围星河道的，应当经过科学论证，经县级以上人民政府水行政主管部门同意后，报本级人民政府批准",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},889136,"根据《中华人民共和国水法》，在江河、湖泊新建、改建或者扩大排污口，应当经过有管辖权的( )同意，由环境保护行政主管部门负责对该建设项目的环境影响报告书进行审批。",[479,481,482,484],{"key":20,"text":480,"correct":22},"县级人民政府",{"key":24,"text":307,"correct":22},{"key":27,"text":483,"correct":22},"省级水行政主管部门",{"key":31,"text":485,"correct":29},"水行政主管部门]或者流域管理机构",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},889137,"2017-54.根据《中华人民共和国水法》，（ ）应当划定饮用水源保护区。",[490,491,492,493],{"key":20,"text":307,"correct":29},{"key":24,"text":309,"correct":22},{"key":27,"text":311,"correct":22},{"key":31,"text":494,"correct":22},"省级人民政府环境保护行政主管部门",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},889138,"2014-60.根据《中华人民共和国水法》，( )应当划定饮用水水源保护区，并采取措施，防止水源枯竭和水体污染，保证城乡居民饮用水安全。",[499,501,502,503],{"key":20,"text":500,"correct":22},"设区的市级人民政府",{"key":24,"text":313,"correct":22},{"key":27,"text":167,"correct":22},{"key":31,"text":504,"correct":29},"省、自治区、直辖市人民政府",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},889139,"2018-61、根据《中华人民共和国水法》，关于新建排污口有关规定的说法，正确的是（ ）。",[509,510,511,512],{"key":20,"text":331,"correct":22},{"key":24,"text":333,"correct":22},{"key":27,"text":460,"correct":22},{"key":31,"text":462,"correct":29},{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},889140,"2019-65、根据《中华人民共和国防沙治沙法》，下列说法中，正确的是( )。",[517,519,521,523],{"key":20,"text":518,"correct":29},"禁止在沙化土地封禁保护区范围内安置移民",{"key":24,"text":520,"correct":22},"不得在沙化土地封禁保护区范围内进行修建铁路、公路等建设活动",{"key":27,"text":522,"correct":22},"对沙化土地封禁保护区范围内的农牧民，沙化土地封禁保护区主管部门应当有计划地组织迁出",{"key":31,"text":524,"correct":22},"沙化土地封禁保护区范围内尚未迁出的农牧民的生产生活，由县级以上地方人民政府妥善安",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},889141,"根据《中华人民共和国防沙治沙法》，土地沙化是指主要因( )。",[529,531,533,535],{"key":20,"text":530,"correct":22},"人类生产活动",{"key":24,"text":532,"correct":22},"极端气象条件",{"key":27,"text":534,"correct":22},"长期干旱气候",{"key":31,"text":536,"correct":29},"人类不合理活动所导致的",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},889142,"根据《中华人民共和国防沙治沙法》，以下沙化土地封禁保护区范围内活动的规定，说法错误的是( )。",[541,543,545,547],{"key":20,"text":542,"correct":22},"禁止在沙化土地封禁保护区内安置移民",{"key":24,"text":544,"correct":22},"在沙化土地封禁保护区范围内，禁止- -切破坏植被的活动",{"key":27,"text":546,"correct":22},"未经国务院或者国务院指定的部门门同意，不得进行修建铁路，公路的活动",{"key":31,"text":548,"correct":29},"沙化土地保护区范围内未迁出的农牧民，由沙化土地封禁保护区主管部门有计划组织迁出并妥善安置",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},889143,"2018-62、根据《中华人民共和国防沙治沙法》所称的土地沙化，是指主要因（ ）所导致的天然沙漠扩张和沙质土壤上植被及覆盖物被破坏，形成流沙及沙土裸露的过程。",[553,555,557,559],{"key":20,"text":554,"correct":22},"自然因素",{"key":24,"text":556,"correct":22},"气候变化",{"key":27,"text":558,"correct":22},"开发建设活动",{"key":31,"text":560,"correct":29},"人类不合理活动",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},889144,"2013-61．根据《中华人民共和国防沙治沙法》，不属于该法土地沙化定义范畴的是（ ）",[565,567,569,571],{"key":20,"text":566,"correct":29},"气候变化导致草场沙化",{"key":24,"text":568,"correct":22},"过度放牧导致草场沙化",{"key":27,"text":570,"correct":22},"天然绿洲人口过载导致沙化",{"key":31,"text":572,"correct":22},"沙漠边缘砍伐植被形成流沙",[574,577,580,583,586,589],{"id":15,"name":575,"category":7,"favorite":576},"领导干部任职前廉政法规知识测试题",92,{"id":578,"name":579,"category":7,"favorite":15},595,"建筑结构与设备",{"id":581,"name":582,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":584,"name":585,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":587,"name":588,"category":7,"favorite":8},534,"BIM工程师",{"id":590,"name":588,"category":7,"favorite":8},535]