[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-574-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":587},{"id":5,"name":6,"category":7,"favorite":8},574,"环境影响评价相关法律法规","建筑工程",0,22,50,2507,[13,34,46,57,69,81,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,295,303,312,321,330,338,350,362,374,382,394,403,415,427,439,451,463,472,484,494,506,518,530,540,552,564,575],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},888795,1,"单选题","2016-17.根据《建设项目环境影响评价分类管理名录》，环境敏感区是指（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","依法设立的各级各类自然、文化保护地，以及对建设项目的污染因子或者生态影响因子有特别关联度的区域",false,{"key":24,"text":25,"correct":26},"B","依法设立的各级各类自然、文化保护地，以及对建设项目的污染因子或者生态影响因子有特别敏感的区域",true,{"key":28,"text":29,"correct":22},"C","依法设立的各级各类自然、人文环境保护区域，以及对建设项目的污染因子或者生态影响因子有特别敏感的区域",{"key":31,"text":32,"correct":22},"D","依法设立的各级各类自然、人文环境保护区域，以及对建设项目的污染因子或者生态影响因子有特别关联度的区域","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},888796,"根据《建设项目环境影响评价分类管理名录》，关于建设项目环境影响评价类别确定原则的说法，错误的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"跨行业、复合型建设项目，其环境影响评价类别按其中单项等级最高的确定",{"key":24,"text":41,"correct":22},"建设单位应当严格按照名录确定建设项目环境影响评价类别，不得擅自改变环境影响评价类别",{"key":28,"text":43,"correct":22},"建设单位应当按照名录的规定，分别组织编制建设项目环境影响报告书、环境影响报告表或者填报环境影响登记表",{"key":31,"text":45,"correct":26},"D名录未做定的建设项目，其环境影响评价类别由省级环境保护行政主管部门根据建设项目的污染因子、生态影响因子特征及其所处环境的敏感性和敏感程度认定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},888797,"根据《建设项目环境影响评价分类管理名录》，环境敏感区是指( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"依法设立的各级各类自然、文化保护地",{"key":24,"text":53,"correct":26},"指依法设立的各级各类保护区域和对建设项目产生的环境影响特别敏感的区域",{"key":28,"text":55,"correct":22},"指依法设立的各级各类保护区域和对建设项目产生的环境影响特别关联度的区域",{"key":31,"text":32,"correct":22},{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":24,"analysis":33},888798,"2016-16.根据《中华人民共和国环境影响评价法》，国家根据建设项目对环境影响的（），对建设项目的环境影响实行分类管理",[61,63,65,67],{"key":20,"text":62,"correct":22},"影响范围",{"key":24,"text":64,"correct":26},"影响程度",{"key":28,"text":66,"correct":22},"影响类型",{"key":31,"text":68,"correct":22},"影响因子",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},888799,"2016-15.根据《中华人民共和国环境影响评价法》，下列说法中，正确的是（）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"建设项目可能造成较小环境影响的，应当填报环境影响登记表",{"key":24,"text":76,"correct":26},"建设项目可能造成轻度环境影响的，应当编制环境影响报告表，对产生的环境影响进行分析或者专项评价",{"key":28,"text":78,"correct":22},"建设项目可能造成重大影响的，应当编制环境影响报告书，对产生的环境影响进行全面分析或评价",{"key":31,"text":80,"correct":22},"建设项目可能造成重大影响的，应当编制环境影响报告表，对产生的环境影响进行分析或专项评价",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":31,"analysis":33},888800,"2018-19、根据《建设项目环境影响评价分类管理名录》，关于建设项目环境影响评价文件类别确定原则的说法，错误的是（ ）。",[85,87,88,89],{"key":20,"text":86,"correct":22},"跨行业、复合型建设项目，其环境影响评价类别按其中单项登记最高的确定",{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":22},{"key":31,"text":90,"correct":26},"名录未做规定的建设项目，其环境影响评价类别由省级环境保护行政主管部门根据建设项目的污染因子、生态影响因子特征及其所处环境的敏感性和敏感程度认定",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":31,"analysis":33},888801,"2017-13.在《建设项目环境影响评价分类管理名录》中未作规定的建设项目，关于其环境影响评价类别的确定，下列说法中，正确的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"因其在《建设项目环境影响评价分类管理名录》未作规定，原则上豁免环境影响评价",{"key":24,"text":98,"correct":22},"由项目所在地生态环境主管部门根据建设项目的污染因子、生态影响因子特征及其所处环境的敏感性质和敏感程度确定",{"key":28,"text":100,"correct":22},"由具有审批权限的环境保护行政主管部门根据建设项目的污染因子、生态影响因子特征及期所处环境的敏感性质和敏感程度确定",{"key":31,"text":102,"correct":26},"由省级环境保护行政主管部门根据建设项目的污染因子、生态影响因子特征及期所处环境的敏感性质和敏感程度提出建议，报国务院环境保护行政主管部门认定",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":31,"analysis":33},888802,"2014-16．根据《建设项目环境影响评价分类管理名录》建设项目环境影响评价类别的规定，下列说法中，正确的是( )。",[107,109,111,113],{"key":20,"text":108,"correct":22},"复合型建设项目应编制环境影响报告书",{"key":24,"text":110,"correct":22},"跨行政区域的建设项目应编制环境影响报告书",{"key":28,"text":112,"correct":22},"涉及环境敏感区的建设项目应编制环境影响报告书",{"key":31,"text":114,"correct":26},"跨行业建设项目，其环境影响评价类别按其中单项等级最高的确定",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},888803,"2014-18．根据《建设项目环境影响评价分类管理名录》，( )属于环境敏感区。",[119,121,123,125],{"key":20,"text":120,"correct":22},"基本农田",{"key":24,"text":122,"correct":22},"沙漠中的绿洲",{"key":28,"text":124,"correct":22},"生态保护小区",{"key":31,"text":126,"correct":26},"水土流失重点防治区",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},888804,"环境影响报告表和环境影响登记表的内容和格式,由( )制定。",[131,133,135,137],{"key":20,"text":132,"correct":26},"国务院生态环境主管部门",{"key":24,"text":134,"correct":22},"国务院",{"key":28,"text":136,"correct":22},"省级人民政府",{"key":31,"text":138,"correct":22},"国务院授权省级人民政府",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},888805,"根据《环境影响评价公众参与办法》，下列说法错误的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"核设施建设项目建造前的环境影响评价公众参与依照本办法有关规定执行。",{"key":24,"text":146,"correct":26},"堆芯热功率300兆瓦以上的反应堆设施和商用乏燃料后处理厂的建设单位应当听取该设施或者后处理厂半径20公里范围内公民、法人和其他组织的意见；",{"key":28,"text":148,"correct":22},"其他核设施和铀矿冶设施的建设单位应当根据环境影响评价的具体情况，在一定范围内听取公民、法人和其他组织的意见。",{"key":31,"text":150,"correct":22},"大型核动力厂建设项目的建设单位应当协调相关省级人民政府制定项目建设公众沟通方案，以指导与公众的沟通工作。",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},888806,"2017-15.根据《中华人民共和国环境影响评价法》，建设项目环境影响报告表由（ ）编制。",[155,157,159,161],{"key":20,"text":156,"correct":22},"建设单位",{"key":24,"text":158,"correct":22},"建设单位委托的机构",{"key":28,"text":160,"correct":22},"环保主管部门指定的评价机构",{"key":31,"text":162,"correct":26},"具有相应环境影响评价资质的机构",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},888807,"2018-22、某工业建设项目环境影响评价文件于2010 年通过省级环境保护主管部门审批建设单位于2016 年方决定开工建设该建设项目供水方案发生重变动，该建设项目环境影响评价文件审批权限已调整为市级环境保护主管部门，根据《中华人民共和国环境影响评价法》，关于该建设项目环境影响评价管理的说法，正确的是( )。",[167,169,171,173],{"key":20,"text":168,"correct":22},"应纳入竣工环境保护验收管理",{"key":24,"text":170,"correct":22},"应当重新报批，该建设项目的环境影响评价文件",{"key":28,"text":172,"correct":26},"该建设项目的环境影响评价文件应当报省级环境保护行政主管部门重新审核",{"key":31,"text":174,"correct":22},"该建设项目的环境影晌评价文件应当报市级环境保护主管部重新审核",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},888808,"2017-17.根据《中华人民共和国环境影响评价法》，下列关于建设项目环境影响评价文件重新报批和重新审核的说法中，正确的是（ ）",[179,181,183,185],{"key":20,"text":180,"correct":22},"建设项目投资主体发生变化，建设单位应当重新报批建设项目的环境影响评价文件",{"key":24,"text":182,"correct":26},"建设项目防治污染的措施发生重大变化，建设单位应当重新报批建设项目的环境影响评价文件",{"key":28,"text":184,"correct":22},"建设项目自环境影响评价文件批准之日起五年建成投产，其环境影响文件应当报原审批单位重新审核",{"key":31,"text":186,"correct":22},"建设项目自环境影响评价文件批准之日起三年，方决定该项目开工建设，其环境影响文件应当报原审批单位重新审核",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},888809,"2014-22．某建设项目环境影响评价文件在2006 年2 月获得国务院环境保护行政主管部门批复，2011 年6 月，建设单位决定照原设计方案开工建设，此时该类型项目的环境影响评价文件审批权限已调整下放到省级环境保护行政主管部门。根据《中华人民共和国环境影响评价法》，下列说法中，正确的是( )",[191,193,195,197],{"key":20,"text":192,"correct":22},"该环境影响评价文件原批复有效，无需再次报批",{"key":24,"text":194,"correct":22},"该环境影响评价文件应报省级环境保护行政主管部门重新审批",{"key":28,"text":196,"correct":26},"该环境影响评价文件应报国务院环境保护行政主管部门重新审核",{"key":31,"text":198,"correct":22},"该环境影响评价文件应报国务院环境保护行政主管部门重新审批",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},888810,"2014-24．某项目运行过程中大气污染防治设施发生重大变化，致使污染物的排放强度与环境影响评价预测情况相比有较大变化。根据《中华人民共和国环境影响评价法》，下列说法中，正确的是( )。",[203,205,207,209],{"key":20,"text":204,"correct":22},"该项目建设单位应当组织环境影响评价，并报原环境影响评价文件审批部门重新审批",{"key":24,"text":206,"correct":22},"该项目建设单位应当组织环境影响后评价，采取改进措施，并报原环境影响评价文件审批部门重新审核",{"key":28,"text":208,"correct":22},"该项目建设单位应当组织环境影响后评价，采取改进措施，并报原环境影响评价文件审批部门重新审批",{"key":31,"text":210,"correct":26},"该项目建设单位应当组织环境影响后评价，采取改进措施，并报原环境影响评价文件审批部门和建设项目审批部门备案",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},888811,"2016-18.某化工建设项目应当编制环境影响报告书，根据《中华人民共和国环境影响评价法》，建设单位应当在报批该项目环境影响报告书前，举行论证会、听证会、采取其他形式征求（ ）的意见",[215,217,219,221],{"key":20,"text":216,"correct":22},"有关专家和公众",{"key":24,"text":218,"correct":22},"有关单位和专家",{"key":28,"text":220,"correct":22},"有关单位和公众",{"key":31,"text":222,"correct":26},"有关单位、专家和公众",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},888812,"2014-19．根据《建设项目环境影响报告表（试行）》的内容及格式要求，下列说法中，正确的是( )。",[227,229,231,233],{"key":20,"text":228,"correct":22},"环境影响报告表可由建设单位自行填报",{"key":24,"text":230,"correct":22},"环境影响报告表不需填报建设项目审批登记表",{"key":28,"text":232,"correct":22},"环境影响报告表可根据建设项目的特点和当地环境特征进行l—3 项专项评价",{"key":31,"text":234,"correct":26},"环境影响报告表进行专项评价的，专项评价按照环境影响评价技术导则中的要求进行",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},888813,"2016-20.根据《中华人民共和国环境影响评价法》，审批部门应当自收到环境影响报告书之日起（）内，作出审批决定并书面通知建设单位",[239,241,243,245],{"key":20,"text":240,"correct":22},"十五日",{"key":24,"text":242,"correct":22},"三十日",{"key":28,"text":244,"correct":26},"六十日",{"key":31,"text":246,"correct":22},"四十五日",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},888814,"2017-18.某热电联产火电机组建设内容发生变动，根据《关于印发环评管理中部分行业建设项目重大变动清单的通知（试行）》，下属于该建设项目重大变动的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"冷却方式变化",{"key":24,"text":254,"correct":22},"排烟高度降低",{"key":28,"text":256,"correct":22},"配套灰场重新选址",{"key":31,"text":258,"correct":26},"供热替代量减少10%以下",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":28,"analysis":33},888815,"2016-21.某石油炼制建设项目内容发生变动，根据《关于印发环评管理中部分行业建设项目重大变动清单的通知》（试行），该项目下列变动中，不属于重大变动的是（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"原料方案发生变化",{"key":24,"text":266,"correct":22},"新增溶剂脱沥青生产装置",{"key":28,"text":268,"correct":26},"储罐总数量增大25%，储罐总容积增大25%",{"key":31,"text":270,"correct":22},"地下水污染防治分区调整，降低地下水污染防渗等级",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},888816,"2018-25、根据《涉及国家级自然保护区建设项目生态影响专题报告编制指南（试行）》，关于专题报告编制要求的说法，错误的是（ ）",[275,277,279,281],{"key":20,"text":276,"correct":22},"项目负责人应具有高级专业技术职称",{"key":24,"text":278,"correct":26},"编制单位应具有工程咨询单位资格证书",{"key":28,"text":280,"correct":22},"编制人员应具有自然保护区及生态学等方面专业背景",{"key":31,"text":282,"correct":22},"评价范围应包括项目建设和运营直接影响和间接影响区，以及整个国家级自然保护区的范围",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":28,"analysis":33},888817,"根据《建设项目环境保护管理条例》环境保护行政主管部门审批环境影响报告书，自收到环境影响报告书之日起（ ）内，做出审批决定并书面通知建设单位。",[287,289,291,293],{"key":20,"text":288,"correct":22},"15日",{"key":24,"text":290,"correct":22},"30日",{"key":28,"text":292,"correct":26},"60日",{"key":31,"text":294,"correct":22},"90日",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},888818,"根据《中华人民共和国环境影响评价法》，审批部门应当自收到环境影响报告表之日起( ）内，作出审批决定并书面通知建设单位。",[299,300,301,302],{"key":20,"text":240,"correct":22},{"key":24,"text":242,"correct":26},{"key":28,"text":244,"correct":22},{"key":31,"text":246,"correct":22},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":28,"analysis":33},888819,"某工业建设项目环境影响评价文件于2010年通过省级环境保护主管部门审批,建设单位于2016年方决定开工建设,该建设项目供水方案发生重大变动，该建设项目环境影响评价文件审批权限已调整为市级环境保护主管部门，根据《中华人民共和国环境影响评价法》，关于该建设项目环境影响评价管理的说法，正确的是（ ）。",[307,308,309,310],{"key":20,"text":168,"correct":22},{"key":24,"text":170,"correct":22},{"key":28,"text":172,"correct":26},{"key":31,"text":311,"correct":22},"该建设项目的环境影响评价文件应当报市级环境保护主管部门重新审核",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},888820,"根据《中华人民共和国环境影响评价法》，下列关于建设项目环境影响评价文件重新报批和重新审核的说法中，正确的是( )。",[316,317,319,320],{"key":20,"text":180,"correct":22},{"key":24,"text":318,"correct":26},"建设项目防治污染的措施发生重大变动，建设单位应当重新报批建设项目的环境影响评价文件",{"key":28,"text":184,"correct":22},{"key":31,"text":186,"correct":22},{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},888821,"某建设项目环境影响评价文件在 2006 年 2 月获得国务院环境保护行政主管部门批复，2011 年 6 月，建设单位决定照原设计方案开工建设，此时该类型项目的环境影响评价文件审批权限已调整下放到省级环境保护行政主管部门。根据《中华人民共和国环境影响评价法》，下列说法中，正确的是（ ）。",[325,326,327,328],{"key":20,"text":192,"correct":22},{"key":24,"text":194,"correct":22},{"key":28,"text":196,"correct":26},{"key":31,"text":329,"correct":22},"该环境影响评价文件应报国务院环境保护行政主管部门重新报批",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":28,"analysis":33},888822,"某石油炼制建设项目建设内容发生变动，根据《关于印发环评管理中部分行业建设项目重大变动清单的通知》(试行)该项目下列变动中，不属于重大变动的是( )。",[334,335,336,337],{"key":20,"text":264,"correct":22},{"key":24,"text":266,"correct":22},{"key":28,"text":268,"correct":26},{"key":31,"text":270,"correct":22},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},888823,"根据《中华人民共和国环境影响评价法》，下列建设项目的环境影响评价文件中，应由国务院环境保护行政主管部门审批的是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"跨行政区域的建设项目",{"key":24,"text":345,"correct":22},"涉及使用剧毒化学品的建设项目",{"key":28,"text":347,"correct":22},"涉密工程等特殊性质的建设项目",{"key":31,"text":349,"correct":26},"由国务院授权有关部门审批的建设项目",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},888824,"某城市拟新建燃煤热电联产项目，目前该城市区域颗粒物超标，根据《火电建设项目环境影响评价审批原则(试行)》，( )符合该项目环境影响评价文件的审批原则。",[354,356,358,360],{"key":20,"text":355,"correct":26},"封闭煤场",{"key":24,"text":357,"correct":22},"严格控制工业用水取用地下水",{"key":28,"text":359,"correct":22},"煤场采用防风抑尘网及覆盖的抑尘措施",{"key":31,"text":361,"correct":22},"单位发电量的煤耗、水耗和污染物排放量等指标达到清洁生产水平",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},888825,"2017-19.根据《建设项目环境影响评价文件分级审批规定》，下列建设项目的环境影响评价文件，由环境保护部负责审批的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":26},"核设施建设项目",{"key":24,"text":369,"correct":22},"机密工程建设项目",{"key":28,"text":371,"correct":22},"由国务院备案的项目",{"key":31,"text":373,"correct":22},"由国务院有关部门备案的对环境可能造成影响的建设项目",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},888826,"2014-23．根据《中华人民共和国环境影响评价法》，下列建设项目的环境影响评价文件中，应由国务院环境保护行政主管部门审批的是( )。",[378,379,380,381],{"key":20,"text":343,"correct":22},{"key":24,"text":345,"correct":22},{"key":28,"text":347,"correct":22},{"key":31,"text":349,"correct":26},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},888827,"2013-20．东部甲乙两省交界的某油库原油贮区位于乙省，建设单位拟在甲省扩建入库原油输送能力。根据《建设项目环境影响评价文件分级审批规定》，负责该项目环境影响评价文件审批的是（ ）",[386,388,390,392],{"key":20,"text":387,"correct":26},"环境保护部",{"key":24,"text":389,"correct":22},"甲省环境保护行政主管部门",{"key":28,"text":391,"correct":22},"乙省环境保护行政主管部门",{"key":31,"text":393,"correct":22},"管辖甲、乙两省的环境保护部督查中心",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},888828,"2017-20.某城市拟新建燃煤热电联产项目，目前该城市区域颗粒物超标，根据《火电建设项目环境影响评价审批原则（试行）》，（ ）符合该项目环境影响评价文件的审批原则。",[398,399,400,401],{"key":20,"text":355,"correct":26},{"key":24,"text":357,"correct":22},{"key":28,"text":359,"correct":22},{"key":31,"text":402,"correct":22},"单位发电量的煤耗、水耗和污染排放量等指标达到清洁生产水平",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},888829,"根据《中华人民共和国环境影响评价法》，针对某环境影响报告书（表）存在严重质量问题的处罚，正确的是（ ）",[407,409,411,413],{"key":20,"text":408,"correct":22},"某县级生态环境主管部门对建设单位处50 万元的罚款",{"key":24,"text":410,"correct":22},"对该单位法定代表人处50 万元罚款",{"key":28,"text":412,"correct":26},"对该单位主要负责人处20 万元罚款",{"key":31,"text":414,"correct":22},"对该单位非直接负责的主管人员处5 万元罚款",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},888830,"2017-12.根据《关于以改善环境质量为核心加强环境影响评价管理的通知》，强化“三线一单”约束作用，除了环境质量底线、环境准入负面清单外，还应包含（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"生态保护红线、资源利用上线",{"key":24,"text":422,"correct":22},"生态保护红线、环境容量上线",{"key":28,"text":424,"correct":22},"生态空间管控红线，资源利用上线",{"key":31,"text":426,"correct":22},"生态空间管控红线，环境容量上线",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},888831,"2018-28、依据《关于以改善环境质量为核心加强环境影响评价管理的通知》，关于建立“三挂钩”机制的说法，错误的是（ ）",[431,433,435,437],{"key":20,"text":432,"correct":22},"现有工程已经造成明显环境问题，应提出有效的整改方案和“以新带老”措施",{"key":24,"text":434,"correct":26},"对未达到环境质量目标考核要求的地区， 依法暂停审批该地区排放相应重点污染物的项目环评文件",{"key":28,"text":436,"correct":22},"对环境质量现状超标的地区，项目拟采取的措施不能满足区域环境质量改善目标要求的，依法不予审批其环评文件",{"key":31,"text":438,"correct":22},"对于现有同类型项目环境污染严重，致使环境容量接近承载力的地区，在现有问题整改到位前，依法暂停审批该地区同类行业的项目环评文件",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},888832,"某办公用房环境影响报告表经当地环境保护行政主管部门审批后，建设地点和建设规模均发生了重大变动。根据《中华人民共和国环境影响评价法》，建设单位的下列做法中，正确的是( )。",[443,445,447,449],{"key":20,"text":444,"correct":26},"该建设单位应重新报批办公用房环境影响评价文件",{"key":24,"text":446,"correct":22},"将环境影响报告表重新报该环境保护行政主管部门审核",{"key":28,"text":448,"correct":22},"对办公用房进行跟踪评价，及时采取防治环境污染的措施",{"key":31,"text":450,"correct":22},"在办公用房建成后向该环境保护行政主管部门申请竣工环保验收时出具变更说明",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},888833,"某高速公路建设项目设计阶段发生重大变动，根据《高速公路建设项目重大变动清单（试行）》，属于重大变动的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":26},"设计车速增加20%",{"key":24,"text":458,"correct":22},"线路长度增加20%",{"key":28,"text":460,"correct":22},"线路横向位移超出200米长度累计达到原线路长度的20%",{"key":31,"text":462,"correct":22},"项目变动导致新增声环境敏感点数量累计达到原敏感点数量的20%",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},888834,"根据《建设项目环境影响评价文件分级审批规定》，下列建设项目的环境影响评价文件，由生态环境部负责审批的是( )。",[467,468,469,471],{"key":20,"text":367,"correct":26},{"key":24,"text":369,"correct":22},{"key":28,"text":470,"correct":22},"由国务院备案的建设项目",{"key":31,"text":373,"correct":22},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},888835,"2018-21、根据《建设项目环境保护管理条例》环境保护行政主管部门审批环境影响报告书，自收到环境影响报告书之日起（ ）内，做出审批决定并书面通知建设单位。",[476,478,480,482],{"key":20,"text":477,"correct":22},"15 日",{"key":24,"text":479,"correct":22},"30 日",{"key":28,"text":481,"correct":26},"60 日",{"key":31,"text":483,"correct":22},"90 日",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},888836,"依据《关于以改善环境质量为核心加强环境影响评价管理的通知》，关于 建立\"三挂钩\"机制的说法，错误的是（）。",[488,490,492,493],{"key":20,"text":489,"correct":22},"现有工程已经造成明显环境问题，应提出有效的整改方案和\"以新帯老\"措施",{"key":24,"text":491,"correct":26},"对未达到环境质量目标考核要求的地区依法暂停审批该地区排放相应重点污染物的项目环评文件",{"key":28,"text":436,"correct":22},{"key":31,"text":438,"correct":22},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},888837,"根据《关于做好环境影响评价制度与排污许可制度衔接相关工作的通知》，关于其中涉及环境影响评价有关要求的说法，错误的是（）",[498,500,502,504],{"key":20,"text":499,"correct":22},"环境影响评价制度是建设项目的环境准入门槛，是申请排污许可证的前提和重要依据",{"key":24,"text":501,"correct":22},"改扩建项目的环境影响评价，应当将排污许可证执行情况作为现有工程回顾评价的主要依据",{"key":28,"text":503,"correct":26},"分期建设的项目，环境影响报告书以及审批文件应当列明分期建设内容，建设单位根据总允许排放量申请排污许可证",{"key":31,"text":505,"correct":22},"纳入排污许可管理的建设项目，可能造成重大环境影响、应当编制环境影响报告书的，原则上实行排污许可重点管理",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":31,"analysis":33},888838,"根据《关于做好环境影响评价制度与排污许可制衔接相关工作的通知》，下列说法正确的是()。",[510,512,514,516],{"key":20,"text":511,"correct":22},"建设项目验收合格之前，排污单位应当按照国家环境保护相关法律法规以及排污许可证申请与核发技术规范要求，不得无证排污或不按证排污",{"key":24,"text":513,"correct":22},"环境影响报告书(表)获得批准的建设项日，其环境影响报告书(表)以及审批文件中与污染物排放相关的主要内容应当纳入排污许可证",{"key":28,"text":515,"correct":22},"建设项目无证排污或不按证排污的，环保部门不得出具该项目验收合格的意见，验收报告中与污染物排放相关的主要内容应当纳入该项口验收完成当年排污许可i执行年报",{"key":31,"text":517,"correct":26},"排污许可证执行报告、台账记录以及自行监测执行情况等应作为开展建设项目环境影响后评价的重要依据",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},888839,"根据《关于做好环境影响评价制度与排污许可制衔接相关关工作的通知》，申请排污许可证的前提和重要依据是( )。",[522,524,526,528],{"key":20,"text":523,"correct":26},"环境影响评价制度",{"key":24,"text":525,"correct":22},"环保竣工验收制度",{"key":28,"text":527,"correct":22},"C总量控制制度",{"key":31,"text":529,"correct":22},"事中事后监督制度",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},888840,"根据《关于以改善环境质量为核心加强环境影响评价管理的通知》，强化“三线一单”约束作用，除了环境质量底线、环境准入负面清单外，还应包含( )。",[534,536,537,538],{"key":20,"text":535,"correct":26},"生态保护红线，资源利用上线",{"key":24,"text":422,"correct":22},{"key":28,"text":424,"correct":22},{"key":31,"text":539,"correct":22},"生态空间管控红线、环境容量上线",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":28,"analysis":33},888841,"2016-23.根据《建设项目环境保护事中事后监督管理办法（试行）》不属于事中监督管理内容的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"施工期环境管理和环境监测开展情况",{"key":24,"text":547,"correct":22},"竣工环境保护验收和排污许可证的实施情况",{"key":28,"text":549,"correct":26},"开展环境影响后评价及落实相应改进措施的情况",{"key":31,"text":551,"correct":22},"环境保护法律法规遵守情况和环境保护部门作出的行政处罚决定落实情况",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},888842,"2018-29、根据《建设项目环境保护事中事后监督管理办法（试行）》，下列内容中，不属于建设项目环境保护事中监督管理主要依据的是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":26},"依法取得的排污许可证",{"key":24,"text":559,"correct":22},"经批准的环境影响评价文件",{"key":28,"text":561,"correct":22},"环境保护有关技术标准规范",{"key":31,"text":563,"correct":22},"环境保护有关法律法规的要求",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},888843,"2018-31.根据《建设项目竣工环境保护验收管理办法》，建设项目环境保护竣工环境的责任主体是（ ）。",[568,569,571,573],{"key":20,"text":156,"correct":26},{"key":24,"text":570,"correct":22},"环境保护行政主管部分",{"key":28,"text":572,"correct":22},"受建设项目委托的有能力的监测机构",{"key":31,"text":574,"correct":22},"受建设项目委托的有能力的技术机构",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},888844,"2018-32、根据《建设项目竣工环境保护暂行办法》，关于建设单位竣工环境保护验收的说话，正确的是（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":26},"具备能力的建设单位可自行编制竣工验收监测报告",{"key":24,"text":582,"correct":22},"建设单位应将验收报告以及其他档案资料报所在地县级环境保护主管部门存栏备查",{"key":28,"text":584,"correct":22},"建设单位应在验收报告编制完成后15 个工作日内，公开验收报告，公示期限为10 个工作日整改建议",{"key":31,"text":586,"correct":22},"验收报告编制完成后，建设单位应根据验收报告结论提出验收意见，对存在验收不合格问题提出整改建议",[588,591,594,597,600,603],{"id":15,"name":589,"category":7,"favorite":590},"领导干部任职前廉政法规知识测试题",92,{"id":592,"name":593,"category":7,"favorite":15},595,"建筑结构与设备",{"id":595,"name":596,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":598,"name":599,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":601,"name":602,"category":7,"favorite":8},534,"BIM工程师",{"id":604,"name":602,"category":7,"favorite":8},535]