[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890246":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},890246,574,2,"多选题","2017-109.根据《关于进一步加强环境影响评价管理防范环境风险的通知》，环境风险预测设定的最大可信事故应包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目施工过程中生产设施发生火灾事故",true,{"key":16,"text":17,"correct":14},"B","项目施工过程中生产设施发生爆炸事故",{"key":19,"text":20,"correct":14},"C","项目营运过程中生产设施发生火灾、爆炸事故",{"key":22,"text":23,"correct":14},"D","项目营运过程中生产设施发生危险物质泄漏事故","ABCD","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]