[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-890238":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},890238,574,2,"多选题","2014-106．根据《规划环境影响评价条例》，专项规划环境影响报告书审查意见包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","评价方法的适当性",true,{"key":16,"text":17,"correct":18},"B","评价标准的合理性",false,{"key":20,"text":21,"correct":18},"C","评价重点确定的准确性",{"key":23,"text":24,"correct":14},"D","环境影响分析、预测和评估的可靠性","AD","",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]