[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889990":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889990,574,2,"多选题","2016-103.根据《中华人民共和国环境保护法》，建设项目中防治污染的设施（）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","不得擅自拆除",true,{"key":16,"text":17,"correct":14},"B","应当与主体工程同时施工",{"key":19,"text":20,"correct":21},"C","应当先于主体工程投入使用",false,{"key":23,"text":24,"correct":21},"D","应当与配套公用工程同时设计","AB","",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]