[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889970":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889970,574,2,"多选题","2016-116.根据《建设项目环境影响后评价管理办法（试行）》，（）应当开展环境影响后评价",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","穿越重要生态环境敏感区的高速公路建设项目",true,{"key":16,"text":17,"correct":18},"B","生态原料、工艺和环保措施发生重大变动的化工建设项目",false,{"key":20,"text":21,"correct":18},"C","当地环境保护主管部门认为应当开展环境影响后评价的造纸项目",{"key":23,"text":24,"correct":14},"D","有重大环境风险，建设地点敏感，且持续排放持久性有机污染物的建设项目","AD","",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]