[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889965":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889965,574,2,"多选题","根据《关于加强“未批先建”建设项目环境影响评价管理工作的通知》下列说法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目开工建设是指地质勘探、平整场地、拆除旧有建筑物等。",false,{"key":16,"text":17,"correct":18},"B","对不符合环境影响评价审批要求的，依法不予批准，并可以依法责令恢复原状",true,{"key":20,"text":21,"correct":14},"C","违法行为有连续或者继续状态的，从行为开始之日起计算。",{"key":23,"text":24,"correct":18},"D","建设单位主动补交环境影响报告书、报告表并报送环保部门审查的，有权审批的环保部门应当受理。","BD","",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]