[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889956":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889956,574,2,"多选题","某建设项目需要编制环境影响报告书，根据《环境影响评价公众参与办法》，建设单位应当在确定了承担环境影响评价工作的环境影响评价机构7日内，向公众公告的信息包括（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目名称、选址选线、建设内容等基本情况，改建、扩建、迁建项目应当说明现有工程及其环境保护情况",true,{"key":16,"text":17,"correct":18},"B","公众提出意见的起止时间",false,{"key":20,"text":21,"correct":18},"C","建设项目对环境可能造成影响的概述",{"key":23,"text":24,"correct":14},"D","环境影响报告书编制单位的名称","AD","",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]