[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889954":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889954,574,2,"多选题","2013-105．《建设项目环境影响报告表》（试行）要求填报的内容包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","公参参与",false,{"key":16,"text":17,"correct":18},"B","环境影响分析",true,{"key":20,"text":21,"correct":18},"C","建设项目工程分析",{"key":23,"text":24,"correct":18},"D","建设项目所在地自然环境和社会环境概况","BCD","",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]