[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889746":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889746,574,2,"多选题","根据《基本农田保护条例》的相关规定，国家能源（ ）等重点建设项目选址确实无法避开基本农田保护区、需要占用基本农田，涉及农用地转用或者征用土地的，必须经国务院批准。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","交通",true,{"key":16,"text":17,"correct":18},"B","通信",false,{"key":20,"text":21,"correct":14},"C","水利",{"key":23,"text":24,"correct":14},"D","军事设施","ACD","根据《基本农田保护条例》第十五条规定，基本农田保护区经依法划定后，任何单位和个人不得改变或者占用。国家能源、交通、水利、军事设施等重点建设项目选址确实无法避开基本农田保护区，需要占用基本农田，涉及农用地转用或者征用土地的，必须经国务院批准。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]