[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889700":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889700,574,2,"多选题","依据《中华人民共和国土地管理法》，经批准的非农业建设占用耕地，占用耕地单位需采取的正确做法是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","按耕地损失三年的总产值赔偿损失",false,{"key":16,"text":17,"correct":18},"B","负责开垦与所占用耕地数量和质量相当的耕地",true,{"key":20,"text":21,"correct":18},"C","在没有条件开垦的情况下，按规定缴纳耕地开垦费",{"key":23,"text":24,"correct":14},"D","按“占多少，垦多少”的原则，赔偿占地所造成的经济损失","BC","《中华人民共和国土地管理法》第三十一条规定，国家保护耕地，严格控制耕地转为非耕地。国家实行占用耕地补偿制度。非农业建设经批准占用耕地的，按照“占多少，垦多少”的原则，由占用耕地的单位负责开垦与所占用耕地的数量和质量相当的耕地；没有条件开垦或者开垦的耕地不符合要求的，应当按照省、自治区、直辖市的规定缴纳耕地开垦费，专款用于开垦新的耕地。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]