[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889643":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889643,574,2,"多选题","关于核设施的环境影响评价书的审批，以下说法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","核设施选址的环境影响报告书由国务院环境保护行政主管部门审查批准",true,{"key":16,"text":17,"correct":18},"B","核设施选址的环境影响报告书由省级以上人民政府环境保护行政主管部门审查批准",false,{"key":20,"text":21,"correct":14},"C","开发利用铀矿的环境影响报告书由国务院环境保护行政主管部门审查批准",{"key":23,"text":24,"correct":18},"D","开发利用伴生放射性矿的环境影响报告书由国务院环境保护行政主管部门审查批准","AC","根据《中华人民共和国放射性污染防治法》第十八条规定，核设施选址，应当进行科学论证，并按照国家有关规定办理审批手续。在办理核设施选址审批手续前，应当编制环境影响报告书，报国务院环境保护行政主管部门审查批准；未经批准，有关部门不得办理核设施选址批准文件。第三十四条规定，开发利用或者关闭铀（钍）矿的单位，应当在申请领取采矿许可证或者办理退役审批手续前编制环境影响报告书，报国务院环境保护行政主管部门审查批准。开发利用伴生放射性矿的单位，应当在申请领取采矿许可证前编制环境影响报告书，报省级以上人民政府环境保护行政主管部门审查批准。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]