[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889621":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889621,574,2,"多选题","环境保护行政主管部门在批准海岸工程建设项目环境影响报告书之前，必须征求（ ）的意见。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","航道行政主管部门",false,{"key":16,"text":17,"correct":18},"B","海事行政主管部门",true,{"key":20,"text":21,"correct":18},"C","渔业行政主管部门",{"key":23,"text":24,"correct":18},"D","军队环境保护部门","BCD","根据《中华人民共和国海洋环境保护法》第四十三条规定，海岸工程建设项目单位，必须对海洋环境进行科学调查，根据自然条件和社会条件，合理选址，编制环境影响报告书（表）。在建设项目开工前，将环境影响报告书（表）报环境保护行政主管部门审查批准。环境保护行政主管部门在批准环境影响报告书（表）之前，必须征求海洋、海事、渔业行政主管部门和军队环境保护部门的意见。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]