[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889495":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889495,574,2,"多选题","依据《建设项目环境保护管理条例》，建设项目的初步设计，应当按照环境保护设计规范的要求，编制环境保护篇章，并依据经批准的环境影响评价文件，在环境保护篇章中提出（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","后评价计划",false,{"key":16,"text":17,"correct":18},"B","防治环境污染的措施",true,{"key":20,"text":21,"correct":18},"C","防治生态破坏的措施",{"key":23,"text":24,"correct":18},"D","环境保护设施投资概算","BCD","《建设项目环境保护管理条例》第十六条规定，建设项目的初步设计，应当按照环境保护设计规范的要求，编制环境保护篇章，落实防治环境污染和生态破坏的措施以及环境保护设施投资概算。建设单位应当将环境保护设施建设纳入施工合同，保证环境保护设施建设进度和资金，并在项目建设过程中同时组织实施环境影响报告书、环境影响报告表及其审批部门审批决定中提出的环境保护对策措施。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]