[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889478":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889478,574,2,"多选题","根据《“十三五”环境影响评价改革实施方案》，“十三五”期间，将建立（ ）的管理机制。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环评",true,{"key":16,"text":17,"correct":18},"B","环保竣工验收行政许可",false,{"key":20,"text":21,"correct":14},"C","“三同时”",{"key":23,"text":24,"correct":14},"D","排污许可衔接","ACD","根据《“十三五”环境影响评价改革实施方案》，“十三五”期间，将取消环保竣工验收行政许可。建立环评、“三同时”和排污许可衔接的管理机制。对建设项目环评文件及其批复中污染物排放控制有关要求，在排污许可证中载明。将企业落实“三同时”作为申领排污许可证的前提。建设项目在投入生产或者使用前，建设单位应当依据环评文件及其审批意见，委托第三方机构编制建设项目环境保护设施竣工验收报告，向社会公开并向环保部门备案。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]