[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889471":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},889471,574,2,"多选题","依据《建设项目环境保护管理条例》，建设项目配套建设的环境保护设施，必须与主体工程（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","同时施工",true,{"key":16,"text":17,"correct":14},"B","同时设计",{"key":19,"text":20,"correct":21},"C","分阶段施工",false,{"key":23,"text":24,"correct":21},"D","分阶段验收",{"key":26,"text":27,"correct":14},"E","同时投产使用","ABE","《建设项目环境保护管理条例》第十五条规定，建设项目需要配套建设的环境保护设施，必须与主体工程同时设计、同时施工、同时投产使用。",{"id":6,"name":31,"category":32,"favorite":33},"环境影响评价相关法律法规","建筑工程",0]