[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889465":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889465,574,2,"多选题","建设项目的环境影响评价文件经批准后，建设项目的（ ）发生重大变动的，建设单位应当重新报批建设项目的环境影响评价文件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工期",false,{"key":16,"text":17,"correct":18},"B","地点",true,{"key":20,"text":21,"correct":18},"C","规模",{"key":23,"text":24,"correct":18},"D","性质","BCD","《中华人民共和国环境影响评价法》第二十四条规定，建设项目的环境影响评价文件经批准后，建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动的，建设单位应当重新报批建设项目的环境影响评价文件。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]