[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889457":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},889457,574,2,"多选题","根据《关于进一步加强环境影响评价管理防范环境风险的通知》（环发[2012]77号），关于防范建设项目环境风险的有关要求为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","突出重点，全程监管",true,{"key":16,"text":17,"correct":18},"B","全面管理，重点监督",false,{"key":20,"text":21,"correct":14},"C","明确责任，强化落实",{"key":23,"text":24,"correct":14},"D","环境风险评价的有关要求","ACD","《关于进一步加强环境影响评价管理防范环境风险的通知》（环发[2012]77号）中，关于防范建设项目环境风险的有关要求如下：①突出重点，全程监管；②明确责任，强化落实；③环境风险评价的有关要求。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价相关法律法规","建筑工程",0]