[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889239":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},889239,574,1,"单选题","2012-77.根据《基本农田保护条例》，关于与建设项目有关的基本农田保护措施，下列说法中错误的是（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","基本农田保护区经依法划定后，任何单位和个人不得改变或者占用",false,{"key":16,"text":17,"correct":14},"B","国家重点建设项目确实需要占用基本农田，涉及征用土地的，必须经国务院批准",{"key":19,"text":20,"correct":21},"C","国家重点建设项目确实需要占用基本农田，涉及农用地转用的，必须经当地省级人民政府批准",true,{"key":23,"text":24,"correct":14},"D","占用基本农田的单位没有条件开垦或开垦的耕地不符合要求的，应按规定缴纳耕地开垦费，专款用于开垦新的耕地","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]