[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889231":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},889231,574,1,"单选题","2013-76．某公路工程拟通过内部未分区的自然保护区。根据《中华人民共和国自然保护区条例》，该建设项目须（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","避绕该自然保护区",true,{"key":16,"text":17,"correct":18},"B","降低公路等级和通行能力",false,{"key":20,"text":21,"correct":18},"C","缩小路基宽度，禁止设置取弃土场",{"key":23,"text":24,"correct":18},"D","优化路由，缩短通过该保护区路线长度","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]